My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3969
>
Resolutions
>
Resolution 3969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 11:24:03 AM
Creation date
4/13/2017 11:23:56 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3969
Date
7/6/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • a,.le" • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1995 TO 2000 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 3 <br /> County No.: 31 AdoptIon Date <br /> MPO: PSRC PRINCIPAL ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A.PROJECT TITLE p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T t a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.TERMINAL BEGINNING AND END o y u I g I d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a I N D.DESCRIBE WORK TO BE DONE v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o .a h y s STARTS Phase UATA 6th Y/N <br /> e y. OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 14 7 A.EVERGREEN WAY IMPROVEMENTS 04 1 C PE 1/98* EIS: <br /> B.EVERGREEN WAY,FAS NO.2791 06 P P R/W 6/98* _ 200 2741 2741 CE: <br /> C.52ND STREET TO MADISON STREET 12 0 CONST 5/99* EA: DATE: <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES T TOTAL N/A: <br /> 14 8 A.EAST MARINE VIEW DRIVE IMPROVEMENTS 04 0.9 C PE 9/94 451 STP(U) _ EIS: Yes <br /> B.EAST MARINE VIEW DRIVE,SR 529 06 F P R/W 5/95 230 DOD* OTHER 1200 369 3113 715 2147 CE:X <br /> C.ALVERSON BRIDGE TO NORTH BROADWAY 12 & T CONST 10/95 863 STP/DOD* EA: DATE: <br /> D.DESIGN AND CONSTRUCT ADD.WB LANE;SIDEWALKS;SIGNAL S 0 TOTAL 1544 N/A: 5/95 <br /> 14 9 A.AIRPORT ROAD HOV LANES 04 2.25 C PE 10/94 _ EIS: Yes <br /> B.AIRPORT ROAD;FAS NO.2586 06 F P R/W 1/95 500 CMAO TIA 3250 1450 4700 500 3850 100 CE: <br /> C.CASINO ROAD TO SR 99 12 T CONST 3/96 EA:X DATE: <br /> D.COMPLETE HOV LANE PROJECT 0 TOTAL 500 * N/A: 1/95 <br /> 14 10 A.EVERETT AVENUE/SR 2 ON-RAMP STUDY 31 00 00 PE 2/97* EIS: <br /> 12 B.EVERETT AVENUE(SR 529),SR 2 P R/W _ 558 304 254 CE: <br /> C.EVERETT AND WALNUT;SB 1d OFF-RAMP TO EB SR 2 CONST EA: DATE: <br /> D.STUDY FEASIBILITY OF ON-RAMP FROM EB EVERETT TO SR 2 TOTAL N/A: <br /> 14 11 A.EVERETT AVENUE IMPROVEMENTS 01 0.15 C PE 3/98 EIS: No <br /> B.EVERETT AVENUE;SR 529 06 P P R/W 100 6000 1900 CE: <br /> C.NORTON AVENUE TO WATERFRONT 08 T CONST 5/99 EA:X DATE: <br /> D.DESIGN AND CONSTRUCT ARTERIAL EXTENSION TO WATERFRONT 0 TOTAL N/A: <br /> 14 12 A EAST MARINE VIEW DRIVE IMPROVEMENTS 05 1.2 C PE 3/98 EIS: <br /> B.EAST MARINE VIEW DRIVE;FAS NO.2797 06 P P R/W 200 3000 1000 CE• <br /> C.NORTH BROADWAY TO 15 12 T CONST 5/99 EA: DATE: <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING AND IMPROVEMENTS 0 TOTAL N/A: <br /> *A portion or all of the funding for these project phases has not yet been committed. • <br /> NOTE: *Local Funds'Include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.