My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1508 100TH ST SW 2018-01-02 MF Import
>
Address Records
>
100TH ST SW
>
1508
>
1508 100TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 2:44:49 PM
Creation date
4/14/2017 10:11:58 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1508
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> 5. SOURCE CONTROL <br /> This project proposes to construct a new SFR on this parcel with a driveway. Per Volurc e <br /> 1 of the City of Everett 2010 Stormwater �lanagement M�nual residential development <br /> does not require source control. <br /> 6. PRESERVATION OF NATURAL DRAINAGE SYSTEM <br /> The runoff irom the site improvements will be dispersed intolover amended soils on-site <br /> and flow in the southerly natural downstream direction. However by breaking up the <br /> existing compacted soils and providing the necessary soil amendments to the soils aruund <br /> thc site a maxinium amount of site runoH from the deveioped project will be absorbzd and <br /> intilirated into the existing on-site soils. This will mimic the existing conditions by <br /> maintaining the existing direction and condition of t�ow from tf��s site. <br /> 7. ON-SITE STORMWATER MANAGEMENT <br /> The soils for this project were found to be Aldervvood sandy loam which have been graded <br /> or had fill placed over it. Since on-site dispersion and soil management will be used the <br /> existing disturbed soils on ihe site will be treated to meet the City requirements for <br /> amended soils. The roof runoH will be directed to one of four splash blocks that will drain <br /> awa/ from the SFR and to a shallow swale along the west or east property lines. The <br /> swale will drain south and eventually leave the site over the southern property line. <br /> For the new PGIS a transition zone has been designed to collect and disperse the flows <br /> along the downslope side oi the new driveway area. The disnersed flows irom the <br /> transition zone will pass over a rninimum of 10-feet of landscaping with amended soils <br /> prior to leavir,g the site. This project does not propose to i�nstruct more than 5,000 sf of <br /> PGIS so it is exempt irom any water quality treatment systems per Minimum Requirement <br /> 6. <br /> Finally, any area of the site not proposed to be covered with impervious suria�es will be <br /> trea!ed to meel the criteria tor DOE BMP T.5.13. Please refer to the engineering plans for <br /> the locations of the soil amendments and additional details <br /> l�dau 100� Ln� 10 SFR 12-1205-10 <br /> fiec 2012 Page 9 � , � <br />
The URL can be used to link to this page
Your browser does not support the video tag.