My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1327 112TH ST SE BASE FILE 2016-01-01 MF Import
>
Address Records
>
112TH ST SE
>
1327
>
BASE FILE
>
1327 112TH ST SE BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 6:38:19 PM
Creation date
4/14/2017 6:37:47 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
1327
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 A t�vo-year guarantee is required for private retentionldetention or other drainage <br /> treatment/abateinent facilities serving areas larger ihan one �cre. <br /> 72 Jn�site water main�vill be staked wilhin an e 3sement to the City The easement will be <br /> ;ubmiUed to lhe City prior lo issuance o�permits. <br /> 13 As-builts oi storm sewer, sanitary seerer, and water systems vdill be required to be submitted <br /> per City Design and Construction Slandards and Specifications for Develo�mem. <br /> 14 Any broken or damaged sidewalk shall be repairedheplaced per the Cdy Public Works <br /> Inspector. <br /> 15 Walkways must be provided on 112'" Street SE lo each building. <br /> 16 All exposei. �round must �e reseedcd within 30 days of the completion of construction. I( <br /> reseeding is nol practical due to weather or seasonal problems, the ground must be <br /> covered v�ith mulch as directed by the City Engineer. <br /> 17 Temporary erosion control measures tor construction activity must be operational prior to <br /> commencemenl of any clearing or earth�vork. <br /> 18 A traffic mitigation fee oi$39,600 is required prior to issuance oi the (irst permit. <br /> 19 Stormwater ireatment is required with 5,000 square feet or more of hydraulically-connected <br /> pavement is created and/or redeveleped by a project Trealment of stormwater runoff from <br /> hydraulically-connected pavement musl occur, per Ciry Standards, pnor to discharge oi the <br /> stoimwaler fonn Uie site, or to a stream, w�lland, or underground infiliration system. <br /> 2D I( sudable soils exi,t on the site, surface slormwater inFdtration systems (e.g., pervious <br /> pa�ers or surface ponding areas analor swales) may be used to hydraulically di�connect <br /> parement. From a stonnwater ireatment siandpoint, for a pavement area to be considered <br /> hydraulically-disconnected, stormwater runo(f i�om a least the G-inonlh, 24-hour storm must <br /> be fully retained and/or in(iltrated. <br /> 2 t The options for treatment of runotf from hydraulicallyconnected pav�ment are <br /> a an in�iltration basin, if suitable soils exist on the site, <br /> I� a wetpond, <br /> c a constructed�vetland, <br /> d a Stormwater 360 StormFilter, with pretreatmenl, <br /> e an aHernative stormwater treatment technology deemad b� the Citv of Everett to t�� <br /> technicaily eyuivalent to ihe above options. <br /> �'� Stormwater detention is required when 5,000 square feet oi more of hydnulically-connectrd <br /> impervious area is crealed by a project. <br /> ;'_3 It unsuitable soils exist on the sile, underground infiltration systems (e.g., iniiltration <br /> t�enchesl or suriace stormwater infillration systems (e.g., splash blocks, pervious pavers, or <br /> s,,riacr. �;cr,d�nr� areas andlor se�ales; may be used to avoid creating hydraulically- <br />
The URL can be used to link to this page
Your browser does not support the video tag.