My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1327 112TH ST SE BASE FILE 2016-01-01 MF Import
>
Address Records
>
112TH ST SE
>
1327
>
BASE FILE
>
1327 112TH ST SE BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 6:38:19 PM
Creation date
4/14/2017 6:37:47 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
1327
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
connected impervious ar?a from a stormwater detention standpoint Section 3-2.2 of ihe <br /> City's Stormwater Management Manual lists site and design criteria that must be met. <br /> 24 From a storm�vater delention standpoinl, for an impervious area to be considerud <br /> hydraulically-disconnecled stormwater runo(f from the 100-year, 24 hour storm must be <br /> fully retained and/or infiltrated—without resulting in significant potential for adverse eifec,s <br /> (rom ihe infiltrated water (such as slope saturation or migration to crawlspaces andlor <br /> basemenis) However, if lhe on-site sc�ls cannot support full infiltration of the 100-year, 24- <br /> hour stonn partial infiltration may slill be feasible to meet allov✓able stormwater release <br /> requiremenis. <br /> 25 f3ecause lhis site is located within the Silver Lake drainaye bas n, lhe options for storm�vater <br /> lreatment tor ihis project are: <br /> a. a wetpond or constructed wetland in series with a vegetated swale, <br /> b a wetpond or constructed v�edand in series�vilh a SMI StormFdter, <br /> c a wetpond or �onstrucled wetland in series with an alternative storm�vater treatmenl <br /> technology deemed, by the City o( Everett, to be technically equivalent to the above options <br /> 2G The required stonnwater lreatment vulume (or wetponds is the volume of developed runoff <br /> (rom the G-incnth, 24-hour storm. City standards�or�vetponds allo�v a maximum of 85°6 of <br /> this volumc lo be provided as underground dead storage in a a�etvault or tank. A minimum <br /> of 15°a of the stormwater treatment volume, however, must be provided in an open-to-the- <br /> air vegetated treatment cell. Piease see the City's Stormwater Management Manual. <br /> Chapt?r 3-3, for more iniormation. <br /> ?� All stonmvaler facilities shall be designed in accordance with applicable City standards <br /> and/or design policies. <br /> 78 An NPD[S (National Pollutant Discharge L=liminalion System) permit, administered by <br /> Washington State's Deparlment of Ecology, will be required for cleanng and grading <br /> actiwties on this site if the site area disturbed by land alleration activities is greater than or <br /> equal lo one acre. <br /> 29 All catch basins in the project must be stenciled with a message similar to "Dump no water. <br /> drains to Silver Lake" This message is lypicalty spray-painted onlo the nround ad�acen( lo <br /> the catch basin �vith the use of a stencil. The stenciling needs to ba repealed, <br /> approximately annuzlly, when the pain e�ears off <br /> 3U fhe applicant is proposiny to provide storr�water tre�tment and detention by mod�fyin� the <br /> existing stonmvater treatmenUdetention system at 1431 - 112"' StreeL This proposal is <br /> acceplable, provided that the modified facilities meet current City standards for both <br /> projects. From the City's standpoint, maintenance oF the etortnwater facilitias al 1431 - <br /> 112"' Street will continue to be the responsibility of Ihe property owner. Any sharing of <br /> maintenance activities or costs must occur via private agreement. <br /> 3 i A pedestrian circulation system for the site must t�e approved by the Planning Direclor an l <br /> Traf(ic Fngineer prior to the issuance o(any building permits, Walkways must allow <br /> pedesVians and wheelchairs to ��in easy access from sidewalks and bus stops to buildin_i <br /> entranced through the use of paths which are physically separated from vehicle tra(fic anc <br /> S <br />
The URL can be used to link to this page
Your browser does not support the video tag.