My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1505 112TH ST SW 2018-01-02 MF Import
>
Address Records
>
112TH ST SW
>
1505
>
1505 112TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 9:32:12 AM
Creation date
4/14/2017 8:04:26 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
1505
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vegetated awaleaI <br />Current City standards call for vegetated "ales to be <br />designed for the 2-year, 24-hour storm peak discharge, with <br />higher flows diverted around the swale. In this case, all <br />flows up to the point that the secondary orifice comes into <br />play should be routed to the swale. All flows through the <br />secondary orifice and through the overflow should be routed <br />directly to the wetland outfall system. The following <br />criteria apply for the design flow in the swale: <br />..n.. = 0.12 <br />max velocity = 1.5 feet per second <br />12ii Max. depth = 0.5 feet <br />4�r 1A� <br />ed ✓ Calculations must be submitted showing that the , the designed biofiltration swale meets City stanlength of <br />dards. <br />r(WO 011/watat ea s ator/grit removal vaults <br />City standards call for the vault to have an inlet capacity <br />determined by using the rational formula with a rainfall <br />e,� intensity of o.5 inches per hour over the contributing area. <br />PTyf In addition, bypass piping is required for the vault per <br />Por a0 r City standards. Normally, the vault inlet capacity should <br />/1" �„e be reached at the point that the water elevation in the <br />rol ,p bypaaa pipe is at Its peak for the 10 year storm. However, <br />1/if tha oil/water separator is located after the detention <br />system and before the swale, the separator can be designed <br />for the maximum flow entering the Swale before direct <br />overflow to the wetland from the detention vault occurs. N2 <br />bypass ping for the separator would be�gquiLed_fpr Shia configure off ---- <br />The separator must be sized to provide a 15 minute detention <br />time for the design flow. <br />The entire contributing area must be used in calculating the <br />size of the oil/water separator vault although only the <br />Paved surface is required to be routed through the <br />separator. <br />The following information regarding the oil/water separator <br />must be submitted for review and approval: <br />^ ' 1) design inlet capacity calculations <br />2) oil/water separator sizing calculations <br />f..3) bypass sizing calculations <br />
The URL can be used to link to this page
Your browser does not support the video tag.