Laserfiche WebLink
F� Sinqle Family or Dunlex — Single (amily or dupler slructures that are reqwred lo have a!ire <br />sprinkler system may use a single domestic water meter (see City of Everett Public Works <br />Standard �raNing 502C). The size of the service meter shall be calculaled by the civil <br />engineer or 6re spr8inkier designer who is solely responsible for these calculations. The Ciry <br />Public Works Department does not review these calculations and is not the authoriry having <br />jurisdiclion. The fire service side oF the system musl I.ave a slate-ap,�roved back(low <br />prevenhon device. <br />9. Construction and demolition o( buildings shall be in complianc� with the provisions oi the <br />2003 International Fire Code, Chapter 14. <br />10. Permils are rcyuired from fhe Fire DepartmeN for rnmoval and li�stallation o( underyround <br />fuel tanks. <br />GENERALINFORMAiION <br />Puge� Sound Energ;� is the natural yas provider in lhis area. To initiate new service orders, <br />plea�.e con�act Marilyn Davis Westlund al (425) 35G-7512 a� least 90 days prior to the <br />requ�red in-service dale. <br />Any relor,ation of existing gas facililies for this development will be at Ihe developer's sole <br />expense, and requires 90 days minimum notice. Please contact Elaina Babby at (206) 224- <br />; 018 to coordinate relocation requests. <br />2 The Snohomish County PUD currenUy has sufficient capacity lo serve the proposed <br />developmenL For furlher in(orm�tion about ihe electrical service requirements (or lhis <br />project, please call Kurl Marlin of �he DistricCs Customer Engineering Of(ice, Everett at 258- <br />8291. <br />3. Veriz �n Northwest has facilities near lhis location. Huwever, any building entrances musl be <br />coordinated at least 60 da��s in advance. The cosl of any relocation of Verizon facilities that <br />is required to construct the new apariments will be at the total expense of lhe developer. Any <br />relocaiion will take GO to 120 days. Please contact Pdike Hupt, Engineer at (425) 35G-4052 or <br />hlike P.ly, Engineer al (425) 35G4034 if you have any questions regarding ihis building <br />entranr,e. <br />a Verizon Northwest will provide service to the site. However, new telephone cable <br />consUuction will be required in conjunction with the site development. Verizon's engineering <br />w�ll begin when they are notified of your construction schedules and telepho�ie requirenients. <br />5 II �vill �e the developer's responsibility to provide a suitable combination o( conduit and <br />Irenching and/or riser conduit to accommodate Verizon's nelwork communications cable <br />ev�thin lhe complex. Provided that an acceptable combination of conduit andlor trenching is <br />incorporated into the project to accommodale Verizon's entrance cable, thcre will b� no cc Is <br />to ihe developer for Venzon's cable. <br />;';� ) <br />