Laserfiche WebLink
native olants. <br />Phase 11 - The new wetland would be excavated to the height of the top <br />of bank of Silver Lake Creek channel. Annual ryegrass would be planted <br />at 15 Ibs./acre and willow cuttinps would be planted at 2 foot spacing. <br />A garage and shed would be removed from the wetland buffer area. <br />The disturbed area and a 37-1/2 foot buffer would be planted with native <br />trees and shrubs in a random triangular spacing pattem. The 25 toot <br />bufier for the outflow from Silver Lake will have an enhanced buHer uf <br />25 feet, with proposed species listed in the mitigation plan dated <br />June 25, 1992. <br />Additional Wetland Mitiaation Reauirements <br />Development of the site must be in confortnance with the proposed mitigation <br />plans and the foilowing modifications and additional conditions� <br />A. Phase I : <br />1. A 35 foot buHer is <br />weUand on the site. <br />the 35 foot bufter. <br />3. <br />required around the entire perimeter of the central <br />A lafoot building setback must be provided outside <br />A wetland at the southeast portion of the site would remain undisturbed. <br />A 50 foot buffer is required adjecent to the wetland and a 10 foot <br />building setback must be provided outside the 50 foot buHer. <br />The surface blanket of organic soils placed in the new wetiand areas <br />must be a minimum of 8 inches deep. <br />The buNer enhancement adjacent to wetland #1 and wetland #2 and <br />proposed wetland plantings must inGude the following species <br />substitutions: <br />a. Rather than holly, the following species shall be planted: nootka <br />rose (Rosa nutkana), hezelnut, ninebar4c and vine maple. These <br />should be planted in equal numbers to total 180. Mock orange <br />(Philadelpf�us lewisii) may nat be used, since it is generally �ound <br />in dry Gearings of Douglas fir forests. Physocarpus capitatus <br />(ninebartc), or another species approved by the Planning <br />Department, shall be used instead. <br />b. Rather than hardhack, an equal number of hardhack and redstem <br />dogwood shell be provided; and <br />c. Rather thnn soR rush the plantings must inGude bullrush (Scirpus <br />microcs�pus), slough sedge (Carex obnupta), spike rush <br />(Eleocharis spp.), and/or sawbeak sedge (Carex sbpata). <br />d. Populus tricocarpa (Black cottonwood) should be planted along <br />the southem and eastem wetland area. There are a number of <br />seedlings and saplings already coming up in the southem area, a <br />number of which could be used for Vansplanting to other portions <br />of the wetland and stream cortidor. In addition, cutting from the <br />existlng Salix sp, should be used to vepetete the open areas <br />within the eastem wetland cortidor. <br />e. To minimize erosion in Geared areas, either appropriate native <br />Exnnu 5 - <br />v -` OF �g. <br />