My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1600 121ST ST SE 2016-01-01 MF Import
>
Address Records
>
121ST ST SE
>
1600
>
1600 121ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:56:45 AM
Creation date
4/14/2017 10:16:29 PM
Metadata
Fields
Template:
Address Document
Street Name
121ST ST SE
Street Number
1600
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1894
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
frontage improvemer,ts for the proposal were within 200 feet of the ordinary high <br />water mark of Silver Lake, and were therefore subject to the Shoreline <br />Mana��ement Ad. A Local Improvement Distnct (LID) was proposed to construct <br />frontage improvements on Silver Lake Road, as well as intersection <br />improvements at SR 527 and 121st St. SW. One of the options available to the <br />applicant was to let the LID construct the required street frontage improvements. <br />If the LID proceeded, the City was to be the proponent for obtaining a shoreline <br />substantial development permit to construct the frontage improvements. <br />Therefore, the City did not require the applicant to submit an application for a <br />shoreline permit. <br />The City has since detertnined that it would be more appropriate to construct the <br />121st St. SWISR 527 intersection improvements with improvements to SR 527 <br />after a design study and environmental analysis of the overall area. Therefore, <br />the LID for 121st Sl. SW is not proceeding at this time, and lhe developer is <br />required to obtain a shoreline pertnit and construct frontage improvements to the <br />site. <br />In April, 1992, representatives of the Washington State Department of Ecology <br />conducled field investigations and defined the ordinery h'gh water mark of Silver <br />Lake. The delineaGon was further to the south than shown on the maps <br />historically used by the City to define the ordinary high water mark. Based on this <br />new inf�rtnation, the 200 foot shoreline jurisdiction extends well onto the project <br />site, and a shoreline pertnit is required for the entire apartmenUtownhouse <br />complex. <br />In May 1992 to July 1992, the applicant submitted a shoreline permit applicaUon <br />for Phase I and Phase II and a SEPA application for Phase II. The current <br />proposal is for the construction of 110 units on Phase I and 12 units on Phase II. <br />Phase I of the proposal must be in confortnance with the requirements of the <br />R-3(A) zone in effect in 1989. Phase II must be in confortnance with the <br />requirements of the current R-3 zone. See Exhibit 8, Casper Creek Vesting <br />Decision, tor detailed infortnati�n regarding the chronology of submittal of <br />application matenals for the proposal, and the vesting of Phase I and Phase II <br />under the Zoning Code. <br />7he City completed a SEPA environmental review for the proposal and issued a <br />Ravised Mitigated Detertnination of Non•significence (MDNS) on <br />August 28, 1992. The 10-day appeal period for the MDNS ended on <br />September 8, 1992. No appeals were received. The MDNS is inGuded as <br />Exhibft 5. <br />ConGusions: The site is located within the 200 foot shoreline jurisdiction of <br />Silver Lake. <br />The project must be d�aveloped in confortnance with all Zoning Code regulations <br />per the Casper Creek Vesting Decision (Exhibit 8). <br />9ased upon compliance with the conditions listed in the MDNS, the proposal will <br />not have a probable significant adverse impact on the enviranment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.