My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1600 121ST ST SE 2016-01-01 MF Import
>
Address Records
>
121ST ST SE
>
1600
>
1600 121ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:56:45 AM
Creation date
4/14/2017 10:16:29 PM
Metadata
Fields
Template:
Address Document
Street Name
121ST ST SE
Street Number
1600
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1894
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
araGina: <br />The elevation of all contour elevations must be designated <br />clearly, especially those associated with the pond and the <br />veqetated swale. <br />oil/water ee�arator(8I: <br />The inlet and outlet elevations of the separator(s), the <br />elevation of the bottom of the separator(s), and the <br />position and height of interfor baffles must be cle�rly <br />shown on the vault detail. <br />The separator must be equippad with a samplinq tee at ite <br />outlet. <br />Downstream conditione must not r^_sulr. in water being backed <br />up into the oil/water separator(s). "he maximum elevation <br />of water downstream should be a minimum of one foot below <br />the invert elevation of the outlet pipe. <br />Overflow pipinq is required for the oil/water separator(s). <br />Therefore, a flow diversio� catch basin must be provided. <br />Please seQ details �471 and �422 in the City of Everett�s <br />Design and Construction Standards and Specifications. <br />The overflow pipe(s) should be equipped with a floatable <br />material separator, per City std. $410, that extends :. <br />minimum of 6" below the invert elevation of the pipe to the <br />separator. <br />The inlet pipe should be sized to convey the oil/water <br />separator design flow when the overflow pipe is conveyinq <br />the 30 year destgn flow. The crown of the vault inlet must <br />be at or below the invert elevation of the bypass pipe. <br />A minimum of two feet must be provided below `_he invert of <br />the vault inlet and the bottom of the flow diversion catch <br />basin. <br />The oil/water separator maintenance notes from section <br />4.11.1 of the City of Everett Desiqn and Construction <br />Standards and Specifications must be included on the plans. <br />Piuina• <br />SDMH 21 should have a solid lid. <br />City standards call for all type II catch basins and <br />manholes to be equipped with ladders per standard plan /606, <br />in addition, all type II catch basins and manholes with <br />"catches" are required to have locking lids. These <br />
The URL can be used to link to this page
Your browser does not support the video tag.