Laserfiche WebLink
01/12/2005 22:54 2530582534 H A INC PAGE 15 <br />Additionally, the Innovative design Is consistent wilh the standards in <br />SCC 30.62.365, and if changes or additions are needed, these will <br />gladly be done (c), <br />The Innovalive design will not be materially detrimental to the publlc <br />welfare or Injurious to property or improvements in the viclniry and <br />zone in which the subJect property is located. Tho design has taken <br />this into account, and the engineer� are responsible for ensu�ing this. <br />An example of the method used for this projeat and Wetland C in <br />particular Is to provide the outlet structure to prevant hydrology from <br />building up an�: �mpa�ting the neighborhood (d). <br />MITIGATION PLAN REG;' 11REMENTS 30,62,345 <br />��) <br />(2) <br />LOSS OF AREA MITIGATION <br />Not applicable. <br />MITIGATION PLANNING <br />Base Lino Study <br />A base Ilne sludy is provided in the provision section. <br />Replacement ot Lost Functional Values <br />Lost functional values w�ll be replaced as described in the provis(on <br />sectlon. <br />MITIGATION TIMING <br />Mltigation plantings will be made preferably between November and <br />March, With proper manegement they can occur at any time. <br />MONITORING PROVISIONS <br />PRE-PLANTING MEETING <br />A representative from B&A Inc. wlll meet with the landscaper prior to <br />plant fnstallation to consult on <br />precise execution of the mltigation plan. <br />3847 BBA,Inc. 1/1V05 <br />to <br />13 <br />