Laserfiche WebLink
d:en be required to pump runoff from your backyard. This suggested solution could <br />potentially be incorporated into the design oi the SR 527 improvement project. <br />You have suggested that the city, wunry and che state coordinate to address your <br />concem. An opportuniry to do this is the North Crcek Flood Hazard Reduction plan <br />currendy being developed by the counry with ciry participadon. Your property <br />ultimately drains to North Creek, so your pazticipation in this planning process would <br />be appreciated. You can become involved in the North Creek Flood Hazard Reduction <br />planning process by calling Meg Moorehead of the Snohomish Counry Surface Water <br />Management at 388-3464. <br />Again, thank you for meeting with me in the field on Feb. 9, 1996. If you have any <br />other questions, feel free to call me at 259-8855. <br />Si c ely, �G���� <br />Dan Mathias, P.E. <br />Utilities Engineer <br />cc: Clair Oliven <br />Terti Murakami <br />Meg Moorehead <br />Vince Rhinehart <br />OM L�IOeIIWJS INnI <br />