• Site visits and clarifications will be performed up to the extent of the budget for the <br /> individual subtasks. <br /> Deliverables: <br /> • Written clarifications and design plans, as requested. <br /> • As-built drawings. <br /> Task 11—Unanticipated Tasks <br /> This task will include additional unanticipated labor or expenses not specifically identified in the <br /> scope of work tasks defined above. Such work items will be implemented on a work order basis <br /> and will be undertaken only after written authorization from the City. <br /> ESTIMATED SCHEDULE <br /> MSA's services described in this scope of work will occur over the following estimated schedule <br /> for the project. <br /> • Notice to Proceed Early May 2010 <br /> • Kick-off Meeting Early May 2010 <br /> • Surveying&Mapping June 2010 <br /> • Geotechnical Investigation June 2010 <br /> • Technical Memorandum& 50%Plans Submittal August 2010 <br /> • City Review of 50% Submittal September 2010 <br /> • Final Design 90% Submittal November 2010 <br /> • City Review of 90% Submittal December 2010 <br /> • Final Design 100% Submittal January 2011 <br /> • Bidding& Construction Contract March 2011 <br /> • Submittals &Material Procurement May 2011 <br /> • Construction Begins June 2011 <br /> • Construction Ends August 2011 <br /> • As-built Plans September 2011 <br /> • Project Closeout October 2011 <br /> Schedule Considerations: <br /> • At the time of this writing,the City is planning a short-term shutdown of Water <br /> Transmission Line 2 in September 2010 and again in April 2011 as part of the Replacement <br /> of the Water Transmission Line 2 Phase 8B project. <br /> • Water from Transmission Line 2 is not available during construction from mid-May through <br /> mid-September. <br /> • Construction activities in the vicinity of Jackson Elementary School should be avoided to <br /> the extent possible to minimize impacts to traffic and school operations when school is in <br /> session from early September through mid-June. <br /> Trans Line 4 Phase 1 Replacement 9$ City of Everett <br /> April 1,2010 Page 12 WO#UP 3421 <br />