Laserfiche WebLink
i <br /> MSA Responsibilities: <br /> 8.1 Open Houses-Assist the City in conducting neighborhood open house meetings(graphic <br /> materials,presentation, etc.) at approximately 50%and 90%progress. <br /> 8.2 Individual Meetings—As requested,participate in individual meetings and other <br /> interactions with residents, K-C, School District, or other individual stakeholders to address <br /> specific site and project issues. <br /> City Responsibilities: <br /> 1. City will take the lead in conducting public involvement activities, mailing etc. <br /> Assumptions: <br /> • MSA will attend two open houses and up to four individual meetings as requested. <br /> Deliverables: <br /> 1. Miscellaneous graphic materials,reference plans and technical support for public involvement <br /> activities. <br /> Task 9—Bidding Assistance <br /> This task provides assistance to the City during bidding and award of the project. <br /> MSA Responsibilities: <br /> 9.1 Bidder Inquiries and Addenda-Assist the City in responding to bidder's questions.Prepare <br /> draft addenda, if necessary, to clarify or correct contract documents or bidding instructions. <br /> 9.2 Pre-bid Conference-Attend a pre-bid meeting, if necessary, for the project and provide <br /> support to the City for specific agenda items. <br /> 9.3 Bid Review-Provide supplemental support in reviewing bids,checking references and <br /> selecting the apparent low bidder. <br /> 9.4 Conformed Drawings and Specifications—Prepare conformed drawings and specifications <br /> as required for construction. <br /> City Responsibilities: <br /> 1. The City will take the lead in tasks associated with printing bid documents, document <br /> distribution,bid advertisement, addenda distribution,plan holder administration,bid evaluation, <br /> bid tabulation etc. <br /> 2. The City will take the lead in receiving and answering bidders' questions. <br /> 3. The City will provide two sets of reference documents to MSA for use during the bidding <br /> period. <br /> Trans Line 4 Phase 1 Replacement 9 6 City of Everett <br /> April 1,2010 Page 10 WO#UP 3421 <br />