My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/08/05 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/08/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:33:12 PM
Creation date
8/6/2015 2:25:38 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/5/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Three sub -basins are adjacent to the golf course and will be included in the <br />work: <br />a. The residential area to the west defined by the Northwest Storinwater <br />Separation project area. <br />b. The residential area to the east, between the golf course and Broadway. <br />c. Portions of the EvCC to the south. <br />2. City will define design storm to use in the modeling. <br />3. Up to three alternatives will be developed and evaluated in detail. <br />4. The technical memorandum will be for the City's internal use, no agency <br />review or SEPA required. <br />5. All alternatives will include the Northwest Stormwater Separation project as <br />the first phase of work. <br />Deliverables: <br />1. Request for Information. <br />2. Workshop meeting agendas and materials, draft and final. <br />3. Workshop meeting minutes, draft and final. <br />4. Basin/catchment area exhibit, draft and final. <br />5. Technical memorandum, draft and final. <br />Task 3 - Surveying and Mapping <br />This task will provide design surveying and mapping needed to produce final design plans <br />(topographic surveys). The surveying and mapping services will be conducted by MSA's <br />subconsultant, Metron & Associates (Metron). Anticipated elements of this task will be <br />similar to those provided by Metron on the City's Sewer M project and include: <br />3.1 Field Survey — Field survey for the base map will include: <br />• Survey limits spanning the width of the existing right-of-way and within the <br />vicinity of the proposed stoinawater drainage pipe alignment and detention pond <br />site. <br />• Surface and underground utility locations; locates requested by Metron and <br />conducted by APS and the City. <br />• Perforin survey at a 1 -foot contour interval: <br />• All significant surface features such as curbs, lane marking, sidewalks, curb <br />ramps, poles, structures, trees and landscaping features. <br />• Basement elevations from up to 10 residences. <br />• Incorporate City of Everett aerial mapping within project area from latest aerial <br />survey available from the City. <br />• Set temporary bench marks (TB Nils) at each street and alley intersection and <br />generally at a midpoint between intersections. Maximum distance between TB FIs <br />will_ be 300 feet. 'IBMs shall be placed in locations where disturbance during <br />construction is unlikely. <br />20 <br />TTT T k t rfi TTTTT A F.`-C'f 1f -T A . r, 0 T k i �- nT_J..,,-.,,.+ C+.�.-,,, .,-�+c..- ,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.