My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1303 58TH ST SW 2016-01-01 MF Import
>
Address Records
>
58TH ST SW
>
1303
>
1303 58TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 12:02:33 PM
Creation date
4/17/2017 12:02:14 PM
Metadata
Fields
Template:
Address Document
Street Name
58TH ST SW
Street Number
1303
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� BROWND <br /> Public Works Deportment <br /> DEC 14 1994 Utilities Division <br /> COST ESTIMATE SHEET 3200 Cedar Street <br /> _. .................._....._..................... Everett, Washington 98201 <br /> CITY OF EVERETT (2(6)259-8800 <br /> Pudic Works Dept. <br /> Receipt # Date Paid 3 <br /> X Cost of Work Order $800 Work Order # <br /> Cost of Service Order $ Service Order# <br /> Contact Person Mike Metzner Telephone # 481-0665 <br /> Requested By Gordon Witcher Date of Request 12-12-94 <br /> REVISED 12-13-94 <br /> Property Owner(name) Merril Creek Estates <br /> Charge Cost to(name if different than owner) Metco Homes T ( C <br /> Address 18913 Bothell-Everctt Hwv City Bothell Zip 98012 <br /> Installation Location 13th Ave W and 58th PI SW. Everett 98201 <br /> Inst7/1 <br /> iontvpe/description/size/etc. t'/1n,z2 W SAW /rtar :I <br /> D <br /> Q-e L'0-'q u'Cf1 <br /> ® The following estimate is base'upon the Utilities Division providing all labor, equipment, materials, restoration, <br /> and final hook-up. <br /> ❑ The following estimate is based upon the Street Division work group providing all labor, equipment, materials <br /> and restoration to property. <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br /> thereof,and provided further,that any excess payment shall be returned to the person applying for the installation. <br /> Itemized Cost Estimate: <br /> cc: Bldg.Permit Counter <br /> Clair Olivcrs <br /> Labor& Benefits $390.00 Tom Thetford <br /> 22L00 Don Weitkamp <br /> Material Kirk Brooks <br /> Equipment Rental 189.00 Gordon Witcher <br /> Dan Lowell <br /> Surface Restoration Stan Mitchell <br /> TOTAL $800.00 <br /> c�— <br /> Prepared by: <br /> Accepted by: <br /> JA <br /> 144Ji e�740� . <br /> l W'TAGN. '010111111190 <br />
The URL can be used to link to this page
Your browser does not support the video tag.