Laserfiche WebLink
COMPLIANCE` <br />REQUIRED. <br />INSPECTION <br />APPROVED <br />IMPORTANT: Please supply Information In the shaded boxes and check the appropriate <br />circles. Disregard topics that don't describe your building or equipment. ODMI place <br />checks In the two left cotumnq. <br />❑ ❑ Walls, Including rim 'Jolsts,'Sha!Ibe Insulated without compression to R- (Calculation <br />❑ ❑ Eajlnterlor below grade walls shall be Insulated to R- (Calculations) <br />❑ ❑ OExterlor slab Insulation, if rot located on Itte interior, shall be R- (Calculations). <br />❑ ❑ .©/aullad Collings shall be Insulated without compression to R---', (Calculations) <br />❑ 11 ❑ IQSkylight wall insulation is Installed and equivalent to the required wall R-values above. <br />will* <br />se Vapor rotarders shall be Installed toward the warm surface as represented below (502,1.6)t <br />Select one option for floors, walls, and appropriate Collings: <br />Floors: Plywood wl exterior glue 0 Poly (2 4 Mil) 0 backed baits <br />Wails: IrX�J Poly plastic (a 4 Mil) 0 Faco-stapled, backed baits 0 PVA paint <br />Ceilings: Not required where ventilation space averagAs >12" above Insulation. <br />Q Face stapled be.cked baits Q Poly plastic (a 4 mil) Q PVA paint <br />❑ ❑ QHeating system efficiency slid slung requlrernents shall be met as represented below: <br />❑ ❑ m ximum heating system output (150% of design hoat load) Is KW S. 503.2.2) <br />BTU/H <br />❑ ❑ Ei]i Heating system requirements will be met with following system (S.503.4.1.1): <br />Mfr __ Model k Max. output KW <br />Typo .._ <br />WSEC Insulation phase requirements: <br />Inspected by: _ Date <br />❑ I I ❑ I@DCmwl space Floors shall be Insulated without compression, and with ,rt s 24" O.C- to: R- <br />❑ ❑ Q Non -vaulted, attic Collings shall be Insulated without compression to: R- <br />Se; <br />❑ ❑ (Ja Door systems shall meet: U- <br />Door types are <br />Page 7 <br />Calculations <br />