My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1415 75TH ST SW BASE FILE 2016-01-01 MF Import
>
Address Records
>
75TH ST SW
>
1415
>
BASE FILE
>
1415 75TH ST SW BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 9:27:50 AM
Creation date
4/18/2017 12:42:25 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1415
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J'Donnell, Driqham � Partners, N. W. E-1540 <br />May 19, 1981 Page 9 <br />In transition zones between cut and fill, the fill should <br />be benclied into native ground every two (2) feet in vertical <br />height. The benches should be at les3t four (4) feet in widl-h. <br />This will re�uce, but not eliminate, cracking due to the cut and <br />fill areas. Allowing tlie fills to remain i., place at least <br />tf�trty (30) days before beginning construction will also reduce <br />or eliminate differential crar.king of ti�e slab. <br />In nreas wliere moisture is undesirable a vapor barrier ma� <br />be placed beneath the slab. One (1) to two (2) inchea of sand <br />may be placed over tlie membrane for protection durinq construc- <br />tion. The slab may be isolated from foundations to :educe the <br />possible detrimental effect� o[ differential settlements between <br />the footings and floor slab. <br />Settlements <br />For the anticipated building and Eill loads, we expect that <br />total settlements on the order oE one (11 inch will occur, with <br />this same amount occurring as diEEerential setClements between <br />cut and dcep 1'ills (qreater than five (5) feet in height). This <br />arnount can be reduced approximately one-half (1/2) by allowing <br />the deep £il:�s to remain in place al least thirty (30) days. It <br />i:; expected that the majority ot post construction settlement <br />sl�ould occu,: during construclion and ttie initial loading of the <br />slab. <br />Lateral Forces <br />Short term wind or,seismic forces may be resisted by pas- <br />t;ive pressures, and/or friction between concrete and the support- <br />zng subgrade. Tiie passlve resistance,may be considered as an <br />equivalent fluid load of two liundred seventy-five (275) pounds <br />per cubLc 'oot. Tliis value assumes tliat all footing backfill is <br />compacted in accordance witli th� Site Preparation recommenda- <br />tions in tliis report. A coefficienl of Eriction of tliirty-flve <br />hundredtlis (0.35) may be considered between concrete and soil. <br />Retaining Walls <br />Retaining walls should be designed to resist lateral earth <br />pre:;sures imposed by the soils relained by these structures. , <br />Walls tliat are designed to rotate tiirough a distance oE 0.002 <br />ti.mes tl�e wall heigti� or less sliould be designed to resist <br />lnteral earth pressures imposed by an equivalent f_'uid with a <br />unit weiglit of thirty-five (35) pcf. If walls are restrained at <br />the top from free tnovement tliey sliould be designed for an <br />additional uniEorm pressure ot fiEty (50) psf. ' <br />/" � The above pre�sures assume no hydrostatic forces and a <br />maxiR�m wall height of six (G) feet, and that no surcharge <br />Earth ConsullanLs, Inc. <br />0�/L.r <br />..�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.