My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
2320
>
2320 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 12:17:19 PM
Creation date
4/18/2017 1:28:03 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
2320
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPUANCE <br />n EOUmED� <br />0 <br />f■I <br />Ll <br />1 <br />tnsPEO ED IMPORTANT: Please supply Information In the shaded boxes and check the appropriate <br />nrrno! <br />circles. Disregard topics that don't describe your building or equipment. DO -NOT Place <br />t checks In the two left columns. <br />1NSULATlDIV PHASE <br />Exterior slab Insulation, if no: located on the interior, <br />for below grade d0 (Tableuse 6 projected above grade. <br />Exterior slab Insulation, it present, shall approve <br />VJaIIs, tnct oing rim joists, shall be insulated without compression to (Table 6-2): <br />OR-15 ball (Options 1.11) ®R-19 (Option III, IV, V. VI, VII) <br />Interior below grade w7lis shall be insulated without compression to (Table 6.2): <br />OFIA5 (Options I, 11) OR-19 (Opllcr.-I III, IV, V. VI, VII) <br />Vaulted callings shall be Insulated without compressfon to R,30 (Table r, All options) <br />❑ r@TiSkylight wall Insulation is installed and equivalent to me iegwieu via , <br />R-values above. <br />❑ Q Vapor retarders shall be installed toward the warm surface as represented below (502.1.6): <br />Select ono option for floors, walls, and appropriate Collins: <br />Floors: O Plywood W1 exterior glue J Poly {� »Edit) Q Backed baits <br />Walls: Poly plastic (a n Mil) O Face-stap!ed, backed baits PVA paint <br />Ceilings: Not required where ventilation space averages >12' above insulation. <br />Face stapled backed baits QPoly plastic (--. 4 mil) G PVA paint <br />❑ Heating system efficiency and sizing rcqulremants shall be met as represented below: <br />El Heat Pump efficiency shall be mot under the following compliance path{S. 503.4t: <br />• Spilt system.:lr source heal pump: I-ISPF a 6.8, COP > 3.0 <br />• Single package, air source heat pump: HSPF a 6.6, COP > 3.0 <br />Water source heal pump: COP >- 3.8 <br />J Ground source heat pump COP a 3.0 <br />❑ Q Central iorce•alr furnace AFUE rating, as listed in the GAMA Directory, shall be: <br />*> .78 (Options I, If, IV, VI, VII) 0 >- .88 (Option III)) C) �74 (Option V) <br />❑ s Non -central, comb ustlon healing systems shall have infermitent ignition <br />❑ z Mr,xlmum heating system output (15o%, of design heat load) is���'4ff BTU/hr. (S.503 t2) <br />❑ �e HI, efficiency forced -air furnace (s 56,000 B T Ulhr. output)may may exceed 1500,001 DHt <br />because: OGMAA listed AFUE is a 78 + 1 per each 5000 BTUlhroutput that it exceeds the OHL <br />WSEC Insulation phase requirements: <br />Inspected by: <br />_ Dafe_—_ -- —� <br />Envelope Floors shall be insulated Wlhoul compression, and with suppon s <br />®R19 (Options 1, II, III, IV, V) OFIn (Optionsvi' VII) <br />Non -vaulted, attic ceilings shall be Insulated without <br />(Option VI) <br />to: <br />®R•30 (Options I, II, III, IV, V, Vu) Q <br />Door systems shall meet: ®U.40 (All options) l3i <br />Door types are (1)_—_---- (2) - <br />24A O.C.1a:• <br />See Table 6-2-1 <br />Page 5 016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.