Laserfiche WebLink
MAR-20-02 10.313 PROM.EVERETT PLANNING DEPT ID.4262676742 PACE <br />3/26 <br />The project proponent has agreed to comply with the S W Everett Subarea Plan Mitigation <br />Decision Document. The project Is hereby designated a Planned Action pursuant to RCW <br />43.21C.031(2)(a) and City of Everett Ordinance No. 2213-97. A SEPA threshold determination <br />is not required for this proposal per 43.21C.031 RCW. This detenttination is dependent upon <br />compliance with the SW Everett Subarea Plan Mitigation Decision Document and all local, state, <br />and federal regulations related to general environmental protection including, but not limited to, <br />right-of-way improvement requirements, drainage, etc. This decision was made after review of a <br />completed environmental checklist and other information on file with the lead agency. <br />There is no public comment period provided for this determination. <br />Responsible <br />Official: Paul A. Roberts <br />Title: Planning and Community Development Director <br />Address: 2930 Wetmore Avenue, Suite 8-A, Everett, WA 98201 <br />Date: <br />Signature: <br />There is no administrative appeal provided for this determination. <br />NOTE: This Planned Action Determination may be withdrawn in the event of significant <br />changes in the proposal, disclosure of new significant information, <br />misrepresentation by the applicant, or failure to comply with the existing <br />regulations or the conditions in the Mitigation Decision Document. <br />INFORMATION FOR DEVELOPER: <br />The following information is provided foi the developer's benefit. These are not SEPA <br />conditions. All requirements are preliminary in nature, and are based upon the preliminary site <br />plan and the ordinances in effect at time of submittal for SEPA review. The proposal must <br />comply with all ordinances in effect at the time a complete building permit application Is <br />flied, including those not specifically set forth herein. (Exception: For vesting under the <br />Zoning Code, please refer to Section 44 of the Zoning Code). Contact the Planning Department <br />for information regarding appeals processes for the requirements listed in this document. <br />AGENCIES WITH JURISDICTION <br />1. A Notice of Construction may be .equirod from the Puget Sound Clean Air Agency <br />depending on the nature of the activity proposed. <br />