Laserfiche WebLink
Bid Summary <br /> Rucker-Hoyt Streetscape Project, Phase 1 <br /> PW3353 <br /> Interwest Construction Inc. $3,487,557.41 (Withdrawn due to bid error) <br /> KLB Construction $3,734,975.46 <br /> Westwater Construction $3,945,101.13 <br /> SCI Infrastructure $4,016,761.26 <br /> Granite NW $4,090,648.99 <br /> West Coast Construction $4,160,890.54 <br /> Engineers Estimate $4,685,072.08 <br />