My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/09/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/09/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 10:59:54 AM
Creation date
4/24/2017 10:59:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A 3 <br /> SCOPE OF WORK <br /> 2. Development of a project schedule with work product due dates, work schedules, and <br /> milestone events. The schedule will be produced using Microsoft Project(R4.0 or above) <br /> and will be submitted to the City of Everett in both print and electronic format. <br /> 3. Manage the project's subconsultants. This subtask includes preparing subconsultant <br /> agreements, coordination, schedules, and invoicing. Subconsultants will be used for: <br /> corrosion protection, supplemental geotechnical engineering,and surveying. <br /> 4. Monthly Status Report/Invoice. Prepare and submit monthly invoices and a brief <br /> monthly status report including: brief summary of work accomplished during the <br /> previous month, budget status, expenditures during the previous month, and issues to be <br /> resolved or coordinated with the City. Submit with each monthly report/invoice a <br /> summary of project costs per task and total cost to-date per task. <br /> 5. Status Meetings Coordinate and conduct status meetings with City staff during final <br /> design. Meetings will include attendance by Project Manager and Project Engineer staff; <br /> it is assumed all meetings will be held at the City's offices. Up to four meetings will be <br /> scheduled for the following purposes: one design meeting, two permitting meetings and <br /> the 95%review meeting. <br /> Task 2. Quality Assurance/Quality Control <br /> 1. Prepare a Quality Management Plan (using brief checklist template) for the project that <br /> identifies personnel and schedules to complete reviews of the work products. The <br /> Engineer will name the personnel for senior review. <br /> 2. Conduct an in-house Quality Assurance review by MWH's senior technical staff prior to <br /> submitting the 95% Submittal to the client. The review will include both civil and <br /> structural disciplines and cover the steel pile bent and pipeline structural design, and <br /> potential pile bent conflicts. <br /> 3. Conduct a constructibility review by MWH staff experienced in project construction. <br /> This review will be performed by the Construction Manager of the Phase 6 project. <br /> 4. All surveying mapping and drawing files must comply with City of Everett Standards <br /> adopted at the time of contract date. <br /> 5. Conduct final check of Contract Document work products including drawings, <br /> specifications and calculations prior to bidding. <br /> Task 3. Supplemental Surveying and Mapping <br /> Provide location survey to supplement the existing base maps for the Phase 7 project. The areas <br /> to be surveyed and mapped are as follows: <br /> MWH Page 2 EVERETT PHASE 7 <br /> 8112/10 EXHIBIT A—SCOPE OF WORK <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.