My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/09/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/09/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 10:59:54 AM
Creation date
4/24/2017 10:59:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> 5. Highway Right-of-Way Use (SR2) Washington Dept. of Transportation <br /> 6. Snohomish County Shoreline Management Snohomish County <br /> Substantial Development Permit (with <br /> Targeted Drainage Plan) <br /> 7. Snohomish County Flood Hazard Permit Snohomish County <br /> 8. Snohomish County Building Permit Snohomish County <br /> 9. Local Utility Companies Snohomish County and others <br /> 10. SEPA Checklist City/Snohomish County <br /> 11. DOH Plan Review Washington Dept. of Health <br /> A total of 40 man-hours are budgeted for the work of this task. <br /> Task 6. Final Design <br /> Prepare updated final design contract documents for the Phase 6 Project as follows: <br /> 1. Structural Design. Conduct a detailed structural design of the Transmission Line 3 and <br /> pile bent support system based on the pipeline/pile bent configuration shown in the <br /> existing Phase 7 contract drawings, 2009 IBC parameters and updated geotechnical <br /> report. Analysis shall include design for internal working and surge pressures, external <br /> seismic loading conditions, temperature stresses, required pipe bending stresses, and <br /> definition of the final pipe wall thickness design. <br /> 2. Revise Contract Drawings. Revise the existing thirty-five (35) Phase 7 drawings to <br /> include the following: <br /> • Incorporate applicable April 2005 bid addenda items from Addenda 1 through 4. <br /> • Review and incorporate into the Phase 7 design applicable Phase 6, 2008 Addenda <br /> items. <br /> • Review and incorporate applicable Phase 6 design modifications identified within <br /> change orders, RFI's, CDC's and November 2008 updated drawings. Applicable <br /> modifications include pile-to-pile cap connections; interior & exterior pile coatings, <br /> pile coating lengths, resolution of potential conflicts with existing TL #2, 3 and 4 <br /> piles, pile saddle detail for sloped saddles at east end, check of coordinates & <br /> stationing, and associated civil and structural drawing enhancements similar to Phase <br /> 6. <br /> • Incorporate 2010 structural design modifications based on 2009 IBC requirements. <br /> • Update CAD drawings to match current Everett standards. <br /> MWH Page 5 EVERETT PHASE 7 <br /> 8/12110 EXHIBIT A—SCOPE OF WORK <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.