My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:53:51 AM
Creation date
4/26/2017 10:52:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> City of Everett Exhibit A—Scope of Work <br /> Water Main Replacement K November 12, 2010 <br /> UP No. 3443 Page 2 of 9 <br /> Deliverables: <br /> • Weekly brief status and monthly earned value analysis report (Excel <br /> spreadsheet—sent as pdf) <br /> • Schedule in MS Project <br /> • Minutes from project kickoff meeting (Word document—sent as pdf) <br /> • Exhibits for neighborhood meeting <br /> • Monthly invoices with supporting documentation. <br /> B. Utility Location and Research <br /> 1. Contract with Parker Fiber Services to provide utility locates for all non-city <br /> primary and secondary utilities (services, etc.). <br /> 2. Coordinate with City Utilities to provide water, sewer and storm sewer mains and <br /> service locates. <br /> 3. Research, contact, and coordinate with utility companies to obtain utility base <br /> maps and/or record drawings for existing power, gas, telephone, and cable <br /> utilities within the vicinity of the project area. <br /> C. Topographic Survey <br /> 1. Provide horizontal and vertical control from the nearest approved City control <br /> monuments (NAD83/91 for horizontal control, NAVD88 for vertical control). <br /> Determine if establishment of new control monuments are required. Provide all <br /> work in accordance with City of Everett Standards and record in City-supplied <br /> field book. <br /> 2. Set additional temporary benchmarks as necessary to facilitate construction of <br /> the project, including at each street intersection and at the midpoint between <br /> intersections where the distance between intersections is greater than 500 feet in <br /> length or 20 feet in elevation difference. <br /> 3. Collect topographic data including the following: invert elevations for manholes, <br /> catch basins, and cleanouts; verify pipe diameters (noting OD vs. ID); measure <br /> downs in valve boxes to top nut; and surface points adequate to estimate ground <br /> surface to nearest 0.1 feet. Collect information within public right-of-way <br /> including: top back curb, face of curb, gutter flowline, edge of gutter, edge of <br /> walks and trails, utility poles, street lights, guy wires, buried utility vaults, <br /> telephone pads, electric transformer boxes, junction boxes, valve boxes, <br /> hydrants, water services, blow-offs, PRV vaults, meter boxes, water shut-offs, <br /> individual service lines, power poles, overhead and buried power/telephone/ <br /> cable/fiber optics, traffic signals, loop detectors in pavement, traffic control boxes, <br /> lane markings, crosswalk markings, guard rails, Jersey curb, traffic signs, surface <br /> markings from utility locates, mailboxes, fences, landscaping items, top and <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.