Laserfiche WebLink
3 <br /> City of Everett Exhibit A—Scope of Work <br /> Water Main Replacement K November 12, 2010 <br /> UP No. 3443 Page 5 of 9 <br /> 5. Provide updated design and construction schedule. <br /> 6. Internal QA/QC and constructability review. <br /> 7. Prepare 60% design submittal for City. <br /> Deliverables: <br /> • 60% Design Drawings (6 hard copies 11"x17", pdf of full-size drawings, CAD <br /> files) <br /> • 60% Design Specifications (6 hard copies, electronic Word files) <br /> • 60% OPCC (Excel file) <br /> • Project Schedule (MS Project electronic file) <br /> G. Permitting Assistance <br /> 1. Provide exhibits, calculations, and other necessary information for inclusion into <br /> City-prepared SEPA checklist. <br /> 2. Provide UFD exhibits, calculations, and other necessary information for inclusion <br /> in City prepared WSDOT utility permit or franchise. <br /> Deliverables: <br /> • Provide one unbound hard copy of exhibits and documentation for SEPA <br /> checklist, and electronic copies in the source document format. Up to two <br /> iterations assumed. <br /> • Provide one unbound hard copy of exhibits and documentation for WSDOT <br /> utility permit or franchise, and electronic copies in the source document <br /> format. Up to two iterations assumed. <br /> H. 90% Design <br /> 1. Prepare 90% Design Drawings, incorporating City review comments from 60% <br /> Design stage. Provide complete set including cover sheet, sheet index, plans <br /> and profiles, and details (Estimated at 27 sheets). Complete construction notes <br /> and call-outs and sheet numbering. <br /> 2. Prepare 90% Specifications, incorporating City review comments from 60% <br /> Design stage. Provide complete contract document including all appendices, <br /> permits obtained, permit applications (if permits not yet obtained), prevailing <br /> wage rate tables, etc. Provide proposal form with quantities identified. <br /> 3. Prepare 90% Opinion of Probable Construction Cost (OPCC), updated from <br /> previous submittal. <br /> 4. Provide updated design and construction schedule. <br /> • <br /> 5. Internal QA/QC and constructability review. <br /> 32 <br />