Laserfiche WebLink
City of Everett Exhibit A—Scope of Work <br /> Water Main Replacement K November 12, 2010 <br /> UP No. 3443 Page 6 of 9 <br /> 6. Prepare 90% design submittal for City. 3 <br /> 7. Attend 90% design review meeting with City. <br /> Deliverables: <br /> • 90% Design Drawings (6 hard copies 11"x17", pdf of full-size drawings, CAD <br /> files) <br /> • 90% Design Contract Documents/Specifications (6 hard copies, electronic <br /> Word files) <br /> • 90% OPCC (Excel file) <br /> • Project Schedule (MS Project electronic file) <br /> I. Final Design / Bid Documents <br /> 1. Prepare Final Design Drawings, incorporating City review comments from 90% <br /> Design stage. <br /> 2. Prepare Final Specifications, incorporating City review comments from 90% <br /> Design stage. <br /> 3. Prepare Final Opinion of Probable Construction Cost (OPCC), updated from <br /> previous submittal. <br /> 4. Provide updated design and construction schedule. <br /> 5. Internal QA/QC <br /> 6. Prepare Final design submittal for City. <br /> Deliverables: <br /> • Final Design Drawings (1 hard copy each 11" x 17" and 22" x 34" signed, <br /> stamped and "camera ready", electronic CAD files) <br /> • Final Design Contract Documents/Specifications (1 hard copy signed, <br /> stamped and "camera ready", electronic Word files) <br /> • Final OPCC (Excel file) <br /> • Project Schedule (MS Project electronic file) <br /> J. Bidding Assistance <br /> 1. Answer up to 12 bidder requests for information. <br /> 2. Prepare up to two Addenda. <br /> Deliverables: <br /> • Up to two Addenda —electronic Word files <br /> 33 <br />