2 <br /> 1. Project Coordination-This task is for general coordination of the Utility Design work. <br /> This includes coordination of the MSA team with TranTech's Project Manager including <br /> meetings, correspondence and communication. <br /> 2. Project Meetings - Coordinate and participate in an initial kick-off meeting with <br /> TranTech and City of Everett staff and attend project coordination meetings as necessary. <br /> It is anticipated that MSA's project manager and staff engineer will attend up to four(4) <br /> meetings with TranTech. <br /> 3. Invoicing- Prepare monthly billings and progress reports describing services provided <br /> and completed in each billing-period. Prepare, monitor--and update MSA's-project--- <br /> schedule. <br /> B. Preliminary Design Package <br /> This task will develop plans and specifications for the preliminary design(30% level of PS&E <br /> design package)for the proposed water main and utility improvements. Plans will be provided <br /> in electronic format to TranTech to be included in the project submittals. Drawings will be <br /> provided per City Standards in AutoCAD format. Surveying and basemapping shall be <br /> performed by others in accordance with the agreement between TranTech and the City. MSA <br /> will acquire and incorporate basemapping into the contract drawings as necessary. The work <br /> under this task includes the following subtasks: <br /> 1. Information Gathering and Review- Compile a list of data and information needed for <br /> the project. Review information from the City relevant to the proposed work. This <br /> information will include existing asbuilts, service and inspection records, geotechnical <br /> reports regarding the subsurface soil condition information, other available plans and <br /> specifications for improvements in the existing right-of-way by other utilities, and all <br /> other relevant information. <br /> 2. Prepare Water Main Preliminary Alignment- Water main improvements will be defined <br /> and a preliminary alignment will be developed,taking into consideration other utility and <br /> roadway improvements for the project. Preliminary plans will be based on the proposed <br /> bridge layout developed by TranTech. <br /> 3. Utility Coordination <br /> i. Utilities owned and operated by other agencies/entities, other than the City, that are <br /> within the project corridor of the bridge improvements will be identified. MSA will <br /> acquire and review record drawings of existing utilities within the project limits and <br /> define potential utility conflicts. For the purpose of preparing this scope of work, it is <br /> anticipated that up to four(4) utilities are located in the project corridor; electrical <br /> power(Snohomish County Public Utility No. 1), natural gas (Puget Sound Energy), <br /> fiber optics (Sprint or other agency), and one additional unknown utility that will <br /> need to be verified. <br /> ii. MSA will schedule meetings with utilities to discuss the project and define utility <br /> needs and design criteria if the utility is impacted by the proposed bridge <br /> 26 <br />