Laserfiche WebLink
2 <br /> improvements. A total of four(4) meetings are anticipated under this subtask. <br /> Meeting will be conducted and minutes will be prepared by MSA. <br /> iii. Based on the data acquired from the utilities,MSA will develop preliminary <br /> alignment, taking into consideration the roadway improvements and the respective <br /> utility standards to be provided by each utility. The development of plans for the <br /> relocation of existing utilities is dependent on the timely delivery and coordination of <br /> accurate and complete plans and information from each utility. <br /> 4. Prepare Opinion of Construction Cost-Prepare preliminary construction cost estimates <br /> for water main and utility improvements based on a 30% complete design level. <br /> 5. Prepare Memorandum- Prepare a technical memorandum to discuss water main and <br /> utility improvements to document the work performed under this work task and to be <br /> incorporated into the Alternative Study Report prepared by TranTech. <br /> TASK 7: CONSTRUCTABILITY & ESTIMATION: <br /> This Task will be performed by TranTech's subconsultant, Ott Construction Consultants(Ott)to <br /> provide public constructability and construction estimation services. <br /> The Task includes the following activities: <br /> A. Support the BNSF Coordination with specific construction means and methods, durations, <br /> and sequencing to satisfy the BNSF requirements. <br /> B. Lane closure and detour planning review and attend one meeting on traffic staging. <br /> C. 30% PS&E Design Report <br /> 1. Attend 2 meetings in Everett <br /> 2. 30% Estimate: Develop Bid Item list and provide a Cost Estimate based upon the 30% <br /> concept. Quantities provided by design <br /> 3. 30% Project Schedule: Develop a Project schedule using Bar Charts utilizing any and all <br /> constraints <br /> 4. 30% Document Reviews: Review the 30%Plans and Specifications for constructability <br /> and consistency. <br /> Deliverables: <br /> • Bid Item list for proposal <br /> • Project Estimate based upon 30%concept <br /> • Project CPM Schedule based upon 30% concept <br /> • Comments from the 30% Plan and specification review <br /> 27 <br />