My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/29 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 8:48:38 AM
Creation date
4/28/2017 8:47:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/29/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> Work Change Directive WCD-15^' Revise the layout of the AC-2 pile wall to avoid conflict with <br /> submerged obstructions. <br /> Increase the Contract Amount by$5,661.00 and add 1 calendar day to Milestone 2 and the Final <br /> Completion. <br /> JUSTIFICATION: <br /> Work Change Directive WCD-01^' Use existing conductors and bus gutters. <br /> Work Change Directive WCD-02^' Use existing conductors and conduit. <br /> Work Change Directive WCD-03 ^'Avoid conflict with future slip-lining of 54-inch pipe between AC-2 <br /> and the oxidation pond. <br /> Work Change Directive WCD-04^' Provide a more stable subgrade for the monorail. <br /> Work Change Directive WCD-05"' Pipe layout was revised to avoid conflicts with other utilities and to <br /> provide uphill slope between the Fan Building and the Headworks. Coatings were changed due to the <br /> harsh environment in the sump. <br /> Work Change Directive WCD-06"'Avoid running cable for one aerator under another aerator and <br /> having the cable sucked into the second aerator. <br /> Work Change Directive WCD-07 ^' Monorail concrete foundation supports were raised by one foot <br /> during construction to avoid high ground water. The new elevation placed part of three of the four <br /> foundations above the surrounding slope protection. <br /> Work Change Directive WCD-08"'WPCF standard. <br /> Work Change Directive WCD-09^'Avoid conflict with buried conduits. <br /> Work Change Directive WCD-10— Completion of Milestone 1 was affected by equipment delivered to <br /> site that was not in accordance with the project specifications or the approved submittal. The <br /> equipment had to be re-fabricated which was a long lead item. In the interim period of time the City <br /> of Everett and McClure and Sons were able to use existing equipment to allow operation of the <br /> aerators. <br /> Work Change Directive WCD-11 — Unused electrical junction boxes conflict with new installations. <br /> The cables in AC-1 could be sucked into the new aerators. <br /> Work Change Directive WCD-12^' By Contract the Owner does not charge the Contractor for the <br /> Electrical Permit. <br /> Work Change Directive WCD-13 ^'The intent of the change is to have the elevation of the top of the <br /> pile closer to the elevation of the slope protection where the two intersect <br /> 8 <br />