Laserfiche WebLink
December 21, 2010 9 <br /> HWA Project No. 98165 <br /> periods of seasonal high and low groundwater levels (January-April and July-October). <br /> This scope and budget includes ten ground water sampling rounds over the first five <br /> years. <br /> Table 1 <br /> Performance Monitoring <br /> Sampling and Reporting Schedule <br /> Ground Water Landfill Gas <br /> Year Date Sampling Report Sampling Report <br /> 1 1/2011 P P <br /> 4/2011 P <br /> 7/2011 P P <br /> 10/2011 P P P <br /> 2 1/2012 P P <br /> 4/2012 P <br /> 7/2012 P P <br /> 10/2012 P P P <br /> 3 1/2013 P P <br /> 4/2013 P <br /> 7/2013 P P <br /> 10/2013 P P P <br /> 4 1/2014 P P <br /> 4/2014 P <br /> 7/2014 P P <br /> 10/2014 P P P <br /> 5 1/2015 P P <br /> 4/2015 P <br /> 7/2015 P P <br /> 10/2015 P P P <br /> P—planned date of execution <br /> The ten ground water sampling rounds included in this scope will include sampling and <br /> analysis for selected semi-volatile organic compounds, selected metals and inorganic <br /> parameters. Samples will also be tested in the field for specific conductance,pH, <br /> dissolved oxygen and temperature. Sampling methods will be in accordance with the <br /> existing Sampling and Analysis Plan, which will be amended to include the performance <br /> monitoring wells, sampling intervals, and analytes. <br /> Contaminants of Concern <br /> The results of the Evaluation Monitoring were used to refine the list of analytes for the <br /> subsequent Performance Monitoring to those compounds that are identified as <br /> compounds of concern (COCs). Determination of the COCs is documented in the HWA <br /> Evaluation Monitoring Report Dated December 14, 2004. COCs to be monitored during <br /> Performance Monitoring include: <br /> • Metals: nickel, zinc, iron, manganese, arsenic <br /> 2010 Exhibit A 12 21 10.doc 827 HWA GEOSCIENCES INC. <br />