My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/02/23 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/02/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 11:09:05 AM
Creation date
4/28/2017 11:08:14 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> Bond Street Combined Sewer Overflow(CSO) Control Facilities Project <br /> LOAN No. L1000022 2 <br /> PART III: PROJECT BUDGET <br /> OLD BUDGET <br /> Total Total Eligible LOAN <br /> Elements (Objects & Tasks) PROJECT PROJECT Cost AMOUNT <br /> Cost <br /> 1. Project Administration/Construction $527,094 $527,094 $527,094 <br /> Management by Recipient <br /> 2. Construction Engineering and $333,000 $333,000 $333,000 <br /> Technical Support by Consultant <br /> 3. Construction $20,577,686 $20,577,686 $5,389,558 <br /> Total $21,437,780 $21,437,780 *$6,249,652 <br /> PART IV. GOALS, OUTCOMES,AND POST PROJECT ASSESSMENT <br /> B. Water Quality Project Outcomes: The following are quantitative results anticipated <br /> from the project. <br /> 1. The City of Everett Bond Street CSO Control Facilities will reduce <br /> combined sewer overflows to one event per year at Puget Sound Outfall <br /> No. 4. <br /> 2. This project will eliminate approximately 5 untreated CSO discharges to <br /> Port Gardner annually. <br /> b. The following will be added: <br /> PART II. PROJECT SUMMARY <br /> The Bond Street CSO Control Facilities PROJECT provides for construction of the <br /> Bond Street Interceptor, Lift Station Two Forcemain, and Lift Station Five Forcemain <br /> Extension and minor pump station revisions to lift station five. <br /> B. Water Quality Project Outcomes: The following are quantitative results anticipated <br /> from the project. <br /> 1. The City of Everett Bond Street CSO Control Facilities will reduce <br /> combined sewer overflows to one event per year at Puget Sound Outfall <br /> No. 4 when the retention basin is funded and completed. The <br /> construction funded bythis LOAN does not include the retention basin. <br /> 2. This project will eliminate approximately five untreated CSO discharges <br /> to Port Gardner annually when the retention basin is funded and <br /> completed. The construction funded by this LOAN does not include the <br /> retention basin. <br /> Page2of3 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.