Laserfiche WebLink
F - <br /> DEPARTMENT OF <br /> ECOLOGY <br /> State of Washington <br /> AMENDMENT NO. 1 <br /> TO LOAN AGREEMENT NO. L1000022 <br /> BETWEEN <br /> THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br /> AND <br /> THE CITY OF EVERETT <br /> PURPOSE: To amend the above-referenced loan agreement (AGREEMENT) between the state of <br /> Washington Department of Ecology (DEPARTMENT) and the City of Everett (RECIPIENT) for the <br /> Bond Street Combined Sewer Overflow (CSO) Control Facilities Project (PROJECT). This <br /> amendment is needed to: 1) modify the scope of work 2) adjust the budget to delete funding for the <br /> retention treatment basin (RTB) construction contract along with construction management and <br /> engineering costs, and reflect that the total eligible project costs are reduced, and 3) to add change <br /> order allowance to the budget. Everett is not able to construct the retention treatment basin at this time <br /> due to lack of funding. <br /> IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows: <br /> 1. The Scope of Work will be modified as follows: <br /> a. The following will be deleted: <br /> PART II. PROJECT SUMMARY <br /> The Bond Street CSO Control Facilities PROJECT provides for construction of a <br /> combined sewer treatment facility consisting of an underground 1,000,000 gallon <br /> retention treatment basin and an above ground structure for screening, disinfection, <br /> pumps, and odor control. Combined sewer overflows would be diverted from Port <br /> Gardner Bay outfalls to the retention treatment basin. <br /> 6 <br />