My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/04/20 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/04/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 9:56:16 AM
Creation date
5/1/2017 9:54:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/20/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> Assumptions <br /> 1. Format will follow existing basin plan content and format. <br /> Deliverables <br /> 1. Draft and final basin plans Word and PDF files. <br /> Task 1400 — SEPA Support <br /> Objective <br /> Provide support services for the preparation.of the updated Sewer Plan SEPA checklist. <br /> HDR Services <br /> 1. Update the 2006 Sewer Plan SEPA Checklist. <br /> City Responsibilities <br /> 1. Provide a Word file for the existing checklist. <br /> 2. Provide any updated information for the SEPA checklist. <br /> Assumptions <br /> 1. This will be a straightforward update of the existing SEPA Checklist. <br /> Deliverables <br /> 1. PDF and Word draft and final SEPA Checklist. <br /> Task 1500 — CSO Control Plan Update <br /> Objective <br /> To prepare a Combined Sewer Overflow (CSO) Control Plan Update that is coordinated with the <br /> 2012 Comprehensive Sewer Plan and that meets Ecology's (WAC 173-245-090 (2)) and EPA's <br /> requirements for a CSO Control Plan Update. <br /> HDR Services <br /> 1. CSO Overflow Structure Documentation: <br /> A. Conduct site visits of control structures and overflow weirs to assess current overflow <br /> configuration and modifications that have been completed since the 2008 CSO <br /> Reduction Plan Amendment. The site visits will be conducted over a one day period. <br /> B. Review City-provided updated "Site Fact Sheets"for each of the City's CSO sites. <br /> 2. Overflow Monitoring and Assessment: <br /> A. Evaluate the modifications made to overflow control structures since the 2008 update... <br /> B. Review the reported overflows since 2008 based on the City's current method of <br /> monitoring and reporting CSOs. <br /> City of Everett Comprehensive Sewer Plan Update 81§ Scope of Services April 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.