Laserfiche WebLink
7 <br /> AMENDMENT FOUR <br /> To <br /> PROFESSIONAL SERVICES AGREEMENT <br /> For <br /> DESIGN OF THE EVERETT PERFORMING ARTS CENTER <br /> DOWNTOWN PLAZA <br /> With <br /> NAKANO ASSOCIATES,LLC <br /> This AGREEMENT, entered into the day of April 2011, constitutes Amendment <br /> No. 4 to the"Agreement"between the City of Everett, "the City"and Nakano Associates, <br /> LLC herein after called the"Consultant,"entered into on the 8 day of October, 2007 and <br /> amended(Amendment No. 1)on April 23, 2008, (Amendment No 2) on June 24, 2009, <br /> and(Amendment No. 3) on September 23, 2010. <br /> WITNES SETH: <br /> WHEREAS, Section 8.0 of the Agreement provides for adjustment or modification of the <br /> Agreement by mutual consent of the CITY and the CONSULTANT; and <br /> WHEREAS,the CITY entered into a professional services agreement with the <br /> _ CONSULTANT to provide design services for the Everett Performing Arts Plaza for the <br /> Parks and Recreation Department; and <br /> WHEREAS, Amendment Number One to that professional services agreement was <br /> entered into to perform additional lighting and electrical design work with an additional <br /> fee; and <br /> WHEREAS,Amendment Number Two to that professional services agreement was <br /> entered into to establish a no-cost time extension to December 31,2011 to complete all <br /> professional services agreement tasks; and <br /> WHEREAS, Amendment Number Three to that professional services agreement was <br /> entered into to coordinate and develop revisions to design and construction documents as <br /> a result of project re-initation with an additional fee; and <br /> WHEREAS, completion of the Former Key Bank Shell and Core project identified <br /> necessary design and construction document development services for improved drainage <br /> connections and plaza power; and <br /> WHEREAS, construction administration services are necessary for construction activities <br /> on the plaza site on an as-needed basis as determined by the City, and <br /> WHEREAS, completion of design services and construction administration services will <br /> require a no-cost time extension to complete; and <br /> 1 <br /> 96 <br />