My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/08/17 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/08/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 9:12:03 AM
Creation date
5/5/2017 9:11:22 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 2 <br /> GENERAL PROJECT ASSUMPTIONS <br /> 1. Topographic and bathymetric survey and boundary mapping will be as provided by others <br /> through CITY. Cost for same is not included in this proposal. <br /> 2. Coordination with other CITY Consultants and Developer is at the direction and with the <br /> approval of CITY. <br /> 3. Work of Group 2 will be incorporated into the design package generated by Group 3, <br /> however contracting for Group 2 work will be directly with the CITY. <br /> 4. LEEDTm Process is not included at this time, however sustainable building practices will be <br /> incorporated into site and building design as program and budget allow. <br /> DESIGN STANDARDS/CRITERIA <br /> 1. City of Everett drawing standards, ACAD 2010, Civil 3D 2010 (converting to LDD as <br /> required for coordination with others), or as agreed. <br /> 2. Specification format for 60%. 90%, and 100% submittal is WSDOT Standard Specifications <br /> with only the Special Provisions prepared by the design team. Scope for 60% submittal will <br /> be outline of Special Provisions and Amendments to the WSDOT Standard Specifications <br /> only. <br /> 3. City of Everett, Design and Construction Standards and Specifications for Development, <br /> current edition. <br /> 4. City of Everett, Stormwater Management Manual, current edition. <br /> 5. City of Everett, Water and Sewer Design Standards, current edition. <br /> 6. WADOE, 2005 Stormwater Management Manual for Western Washington. <br /> 7. WSDOT, Standard Specifications for Road, Bridge, and Municipal Construction, English, <br /> current edition and Amendments. <br /> 8. AASHTO LRFD Bridge Design Specifications <br /> SCHEDULE <br /> The scope of work is premised on a Notice-to-Proceed date of August 1, 2011. Schedule for <br /> completion of individual work tasks will be coordinated with milestones for completion of CITY and <br /> Developer tasks. <br /> Tentative schedule as follows (permit review/comment schedule dependant): <br /> • 60% PS&E for Early Phase Projects March 2012. <br /> • 100% PS&E for Basic Trail and Enhanced Drainage Channel in Railroad Corridor. Interim <br /> submittals 60% October 2011, 90% January 2011, 100% March 2012. <br /> • 60% PS&E for South Wetland Complex and Stormwater Management Implementation <br /> (Bigelow Creek) March 2012. . <br /> DELIVERABLES <br /> Deliverables will be provided as noted herein and as described in detail in individual Task Order <br /> Documents. <br /> • TASKS <br /> 000. GEC Management <br /> 0.1 Coordination and Review: Coordinate the CONSULTANT design team to ensure that the <br /> work is completed on schedule, is technically competent, and meets the CITY's <br /> requirements. Develop and implement the work plan and provide overall coordination and <br /> 3 <br /> 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.