My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/09/21 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/09/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 10:23:40 AM
Creation date
5/5/2017 10:23:07 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
keylnea� .Q <br /> 6 � � t�,.�or-k, <br /> Exhibit A-4 <br /> Scope of Services: Task 600 Additional Surge Analysis <br /> AWD 401-05 Pump Station 1 Upgrade <br /> Alderwood Water and Wastewater District <br /> The following proposed Scope of Services is in response to Alderwood Water and Wastewater <br /> District's (AVVWD's) request for Kennedy/Jenks Consultants (Kennedy/Jenks)to provide services to <br /> evaluate surge conditions involving AVVWD's Pump Station 1 (PS 1), Pump Station 2(PS 2), and the <br /> City of Everett's (City's) Evergreen Way Pump Station (EWPS). <br /> Surge analysis is included within the current contract. This existing scope is limited to the discharge <br /> side of PS 1 and PS 2. The surge analysis to be provided under this scope of services will evaluate <br /> the suction side of the three pump stations, the City's Reservoir 3, and associated piping. <br /> Scope of Services <br /> The engineering services to be performed during the construction period are in accordance with the <br /> current project schedule (Exhibit C-4 attached). The proposed services include transient flow <br /> modeling by Flow Science (existing subconsultant) and supporting efforts by Kennedy/Jenks. <br /> Task 600 —Additional Surge Analysis <br /> Task 610 — PS 1, PS 2, and EWPS Suction Evaluation <br /> Task 610.1 Preliminary Concepts Technical Memorandum <br /> Surge evaluation efforts previously performed under this contract considered conditions in the <br /> AVVWD distribution system downstream of PS 1 and PS 2. The impact of potential surge events on <br /> the system upstream of the pump stations was specifically excluded due to its dependence on the <br /> operation of the Reservoir 3 and EWPS. <br /> A technical memorandum will be prepared to identify potential surge concerns, and to determine <br /> whether further evaluation is warranted. The memorandum will include a schematic diagram of the <br /> system, a table summarizing potential hydraulic concerns, and a brief memorandum. The <br /> memorandum will be submitted to AVVWD and City for review. The memorandum will address what <br /> evaluations, including the use of system modeling, are recommended to be completed. <br /> Task 610.2 Surge Evaluation <br /> The hydraulic transient analysis model previously developed by Flow Science for PS1 and PS 2 will <br /> be modified to include the operation of-theEVVPS,"-Berry-Line and- eservbir -:-Ttie.revised-model <br /> will be used to evaluate surge conditions caused by various operational conditions at the pump <br /> stations. <br /> Up to 5 scenarios will be analyzed using the model. The results of the analysis, along with possible <br /> measures to mitigate surge affects, will be presented to AWWD and the City in a meeting. <br /> Task 610.3 Findings and Recommendations Technical Memorandum q, <br /> t�t rilevO itte rcL A/v, 2. <br /> 1 <br /> • 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.