Laserfiche WebLink
7 <br /> Assumptions: <br /> • The plans sheets above will be submitted to the prime consultant for <br /> incorporation into the City submittal. The Prime Consultant will prepare all <br /> other sheets. <br /> • The Prime Consultant will lead the effort of preparing the Bid <br /> Documents including the City boilerplate, special provisions, and required <br /> Federal Aid documentation. <br /> Design Criteria: <br /> Reports and plans,to the extent feasible, shall be developed in accordance with <br /> the latest edition and amendments of the following: <br /> a. AASHTO 2001, "A Policy of Geometric Design of Highways and <br /> Streets." <br /> b. Washington State Department of Transportation, "Standard Specifications <br /> for Road and Bridge Construction." <br /> c. Washington State Department of Transportation,"Design Manual." <br /> d. Washington State Department of Transportation, "Materials Laboratory <br /> Outline." <br /> e. Washington State Department of Transportation,"Construction Manual." <br /> f. Washington State Department of Transportation, "Local Agency <br /> Guidelines." <br /> g. Highway Research Board's Manual entitled"Highway Capacity." <br /> h. FHWA and Washington State Department of Transportation, "Manual on <br /> Uniform Traffic Control Devices for Streets and Highways." <br /> i. City of Everett Design& Construction Standards and Specifications. <br /> j. AASHTO "Guide for the Development of Bicycle Facilities." <br /> k. WSDOT Highway Runoff Manual <br /> 1. WSDOT Hydraulics Manual <br /> m. King County Surface Water Design Manual <br /> 49 <br />