My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/09/21 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/09/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 10:23:40 AM
Creation date
5/5/2017 10:23:07 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> TASK 10 STRUCTURAL. DESIGN <br /> TranTech will perform structural analysis and design to replace the existing Broadway <br /> Overcrossing. The work includes demolition of the existing structure and replacing it with a <br /> bridge structure that has the same footprint and alignment. The new structure shall satisfy BNSF <br /> guidelines. Some of the clearance guidelines may subject to future negotiations with BNSF. The <br /> bridge design will follow the most current WSDOT,AASHTO, and City requirements. <br /> Throughout the structural design activities, special care will be given toward low impact design <br /> approach for many reasons including noise reduction and protection of the adjacent businesses <br /> and buildings. <br /> The design parameters involved for the superstructure and substructure design of this bridge <br /> replacement project are: <br /> a. Railroad crossing requirements and approvals <br /> b. Retaining wall requirements <br /> c. Bridge Deck Drainage <br /> d. Construction clearances <br /> e. Inspection and Maintenance requirements <br /> f. Aesthetic considerations and special structures <br /> g. Traffic detour requirements <br /> h. Staged construction <br /> i. Geotechnical requirements <br /> The activities in this task include the following subtasks: <br /> 1. 60%PS&E Package Preparation <br /> This Task encompasses all the activities associated with the preparation of the 60% <br /> PS&E construction documents. The following are the categorized activities associated <br /> with this Task: <br /> a. General <br /> b. Structure Removal <br /> c. Structural <br /> d. Paving and Channelization <br /> e. Grading and Drainage <br /> f. Traffic control plan <br /> g. Staging <br /> h. Constructability review <br /> i. 60%PS&E Plans <br /> j. 60%PS&E Engineer's Estimate Preparation <br /> k. 60%PS&E Special Provisions Preparation <br /> 1. 60%PS&E QA/QC <br /> 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.