My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/09/21 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/09/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 10:23:40 AM
Creation date
5/5/2017 10:23:07 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> Deliverables: <br /> • 60%PS&E Documents <br /> • One 11x17 (half size)plan <br /> • Special Provisions at 60%level supporting the new bridge civil <br /> infrastructure. <br /> • One copy of the quantity estimate and opinion of cost. <br /> 2. 90%PS&E Package Preparation <br /> This Task encompasses all the activities associated with the preparation of the 90% <br /> PS&E construction documents. The following are the categorized activities associated • <br /> with this Task: <br /> a. General <br /> b. Structure Removal <br /> c. Structural <br /> d. Paving and Channelization <br /> e. Grading and Drainage <br /> f. Traffic control plan <br /> g. Staging <br /> h. Constructability review <br /> i. 90%PS&E Plans <br /> j. 90%PS&E Engineer's Estimate Preparation <br /> k. 90%PS&E Special Provisions Preparation <br /> 1. 90%PS&E QA/QC <br /> Deliverables: <br /> • 90%PS&E Documents <br /> • One 11x17 (half size)plan <br /> • Special Provisions at 90%level supporting the new bridge civil <br /> infrastructure. <br /> • One copy of the quantity estimate and opinion of cost. <br /> 3. 100%PS&E—Bid Ready <br /> The activities associated with the preparation of 100%PS&E documents are listed in the <br /> following: <br /> a. 100%PS&E Plans <br /> b. 100%PS&E Engineer's Estimate Preparation <br /> c. 100%PS&E Special Provisions Preparation <br /> d. 100%PS&E QA/QC <br /> Deliverables: <br /> • One 11x17 (half size) plan <br /> o One full sized original signed plan set at Final <br /> • Special Provisions at 100% level supporting the new bridge civil <br /> infrastructure. <br /> 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.