My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/11/16 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/11/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 11:58:15 AM
Creation date
5/5/2017 11:57:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/16/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A to the Professional Services Agreement <br /> between The City of Everett and The Blueline Group, LLC for the <br /> Water"L" Improvements- Hewitt Ave(WO#UP3462) <br /> dated October 28,2011 <br /> Task 005 - 60% DESIGN <br /> Based on City review comments from the Preliminary Design stage, Blueline will proceed to the 60% <br /> Design stage, including: <br /> • Project Walk-through with City engineering and maintenance staff. <br /> • Review meeting with City staff. <br /> • Incorporating City's Preliminary Design comments into the contract documents. <br /> • Developing plan set as follows for the proposed water main improvements: <br /> o Proposed water system alignments shown in plan & profile per City standards. <br /> o Refined Connection Details and Preliminary Testing Details. <br /> o Cover Sheet, General Notes, and Sheet Index included. <br /> o Temporary erosion and sedimentation control notes and details as necessary. <br /> o Preliminary details necessary shown, referencing City standard water details and <br /> developing specialized details as necessary. <br /> • Preparing draft technical specifications in City format, including identifying bid item for <br /> Division D. <br /> • Preparing an Engineer's Opinion of Probable Construction Cost. <br /> Send plans to impacted utility providers for review and comment. <br /> • Providing an updated design schedule if necessary. <br /> • Internal Constructability review and QA/QC. <br /> Deliverables: 60% Design Plans(6 hard copies sets at 22"x34"). <br /> 60% Design Plans(PDFs and CAD - DWG& DWF files). <br /> 60% Design Specifications(3 hard copies& Word file). <br /> 60% Engineer's Opinion of Probable Construction Cost including Quantity <br /> Take-Off Sheets(Excel electronic file). <br /> Updated Design Schedule if necessary(MS Project electronic file). <br /> Email accompanying the submittal that outlines assumptions, questions, and <br /> recommendations (Email). <br /> Task 006 - 90% DESIGN <br /> Based on City review comments from the 60% Design stage, Blueline will proceed to the 90% Design <br /> stage, including: <br /> • Review meeting with City staff. <br /> • Incorporating City's 60%comments into the contract documents. <br /> • Complete plan set that includes the following: <br /> o Cover Sheet, General Notes, Sheet Index, Plans and Profiles, and Detail Sheets. <br /> o Call-outs,sheet numbering, and construction notes. <br /> o Final Testing and Connection Details. <br /> • Preparing technical specifications in City format, using City-provided standard specifications <br /> when available. <br /> • Refining the Engineer's Opinion of Probable Construction Cost. <br /> • Providing an updated design schedule if necessary. <br /> • Internal Constructability review and QA/QC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.