My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/03/14 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/03/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 8:37:57 AM
Creation date
5/10/2017 8:37:14 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/14/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12, <br /> Scope of Work <br /> Continued <br /> • The City will collaborate with Otak to adjust the preferred the level of analysis for <br /> each project that conforms to the budget defined for the CIP project analysis. <br /> Task 5 Deliverables: <br /> • CIP project rankings for the top 20 projects <br /> • CIP project summary sheets <br /> Task 6— Basin Plans and Watershed Plan Document Preparation <br /> This Task includes the analyses and preparation of a basin plan chapter for each of the <br /> nine Phase 2 basins. The basin plans will be inserted into the watershed plan as <br /> outlined in the Protocols document. <br /> 6.1—Basin Plans <br /> Otak will prepare a Basin Plan for each of the nine basins to document the drainage <br /> analysis of the City's surface water systems. Each basin plan will include stormwater <br /> calculations, graphics, summary of analysis methods, results, and CIP concept design <br /> recommendations. These will follow the basin plan outline presented in the Protocols <br /> document. <br /> 6.2—SWCP Volume 3 Port Gardner Bay Watershed Plan <br /> The final SWCP format, as outlined in the Protocols document, is a four-volume report. <br /> Volume 1 will be a Summary and Implementation Plan and will be written as part of <br /> Phase 3. Volumes 2, 3 and 4 are watershed plans. The Basin Plans developed in <br /> Phase 1, 2 and 3 are envisioned as individual chapters that will be inserted into the <br /> watershed plans as they are completed. This task will complete Volume 3 Port Gardner <br /> Bay Watershed Plan. <br /> Task 6 Assumptions: <br /> • City will prepare report-ready graphics in GIS based on sketches from Otak for <br /> each Basin Plan <br /> • Each Draft Basin Plan will be reviewed by the City's Internal Review Team <br /> • The City will provide one compiled set of comments from City staff, with conflicts <br /> between review comments resolved by the City Project manager. <br /> • Each Final Basin Plan will be reviewed by the City's project manager only to <br /> verify that all comments have been addressed. <br /> City of Everett—Surface Water Comprehensive Plan Phase 2 11 <br /> February 13, 2012 136 otak <br />
The URL can be used to link to this page
Your browser does not support the video tag.