My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/04/04 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/04/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 10:00:15 AM
Creation date
5/10/2017 9:58:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> REQUEST FOR PROPOSALS <br /> General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility <br /> • _ Expansion-Phase C <br /> selection committee to quickly access pertinent information. Proposals <br /> should avoid duplication of information presented in the Proposal. <br /> B. Proposal Outline: The proposal shall be organized as follows: <br /> 1. Letter of Interest; The Proposer may include a Letter of Interest with <br /> the Proposal not to exceed two (2) pages. The Letter of Interest may <br /> contain any information desired by the proposer but not required by <br /> this RFP. <br /> 2. Responses to Evaluation Criteria <br /> 3. Proposal Certification Form: Complete Form in Attachment B. <br /> 4. Accident Prevention Program for your firm. A single copy may be <br /> submitted under separate cover, but must still be submitted by the <br /> proposal submission deadline. <br /> 5. Safety and Health Qualifications Statement: The form must be <br /> submitted by the proposal submission deadline and will not be part of <br /> the evaluation criteria. <br /> C. Evaluation Criteria: The Evaluation Criteria to be used in evaluating the <br /> Proposals and maximum number of points assigned for each criterion are <br /> outlined below. In responding to the Evaluation Criteria, the Proposer should <br /> organize its proposal so that the qualifications are clearly illustrated for each <br /> Evaluation Criteria. <br /> No. Evaluation Criteria for Proposals Maximum <br /> Points <br /> 1 Qualifications of Proposer 50 <br /> 2 Qualifications and Past Experience of Key Personnel 250 <br /> 3 Past Experience and Performance of the Proposer 100 <br /> 4 Proposer's Approach to Executing the Project 100 <br /> 5 Proposer's Ability to Meet Time and Budget 70 <br /> Requirements <br /> 6 Location of the Firm 130 <br /> Total for Proposals: 600 <br /> 7 Interview 200 <br /> 8 Final Proposal 200 <br /> Total for Selection Process: 1000 <br /> City of Everett Page 17 April 16, 2012 <br /> Water Pollution Control Facility Expansion-Phase C2 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.