My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/04/04 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/04/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 10:00:15 AM
Creation date
5/10/2017 9:58:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR PROPOSALS <br /> General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion-Phase C <br /> 4. Excellent communication skills, especially with Owner, Design <br /> Engineer, and Subcontractors <br /> 5. Experience overseeing project schedules <br /> 6. Experience as a project manager on a wastewater treatment plant <br /> project <br /> 7. Experience as a project manager on at least one job exceeding $20 <br /> million that included structural and mechanical work <br /> Superintendent <br /> 1. Experience as a superintendent on a wastewater treatment plant <br /> project <br /> 2. Experience as a superintendent managing multiple subcontractors <br /> 3. Experience as a superintendent on at least one job exceeding $10 <br /> million that included structural and mechanical work • <br /> 4. Experience overseeing a project that included instrumentation and <br /> controls (I&C), electrical, and mechanical <br /> 5. Excellent communication skills, especially with Owner, Design <br /> Engineer, and Subcontractors <br /> Project Engineer <br /> 1. Experience on a wastewater treatment plant project <br /> 2. Excellent communication skills, especially with Owner, Design <br /> Engineer, and Subcontractors <br /> 3. Knowledge about all phases of construction <br /> 4. Have a bachelor's or master's degree in engineering <br /> 5. Knowledge about construction administration practices <br /> 6. Capable of providing field verification of construction, complying with <br /> plans and specifications <br /> C. Organizational Chart: Provide an organizational chart showing the overall <br /> organizational structure for the Project Team. Provide a separate chart for <br /> the preconstruction and construction phases. <br /> D. Availability of Key Personnel: Discuss the availability and commitment of <br /> the key primary and backup personnel identified for the entire Project <br /> (Preconstruction Services and Construction Services). Discuss the impact of <br /> City of Everett Page 22 April 16, 2012 <br /> Water Pollution Control Facility Expansion-Phase(;25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.