My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/04/04 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/04/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 10:00:15 AM
Creation date
5/10/2017 9:58:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR PROPOSALS <br /> General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion-Phase C <br /> B. Systems: What estimating and scheduling systems and management <br /> techniques would your firm employ to achieve success in these items? <br /> Evaluation Criterion 6 Location of the Firm 30 points <br /> Note: Information submitted in response to this Evaluation Criterion should be no <br /> longer than three (3) pages. <br /> A. Firm's proximityto the Project location: State the number of miles the <br /> Project location is to the established local office of your firm that would be <br /> managing the project. Explain what tools you would use to ensure effective <br /> management of the project based on the distance. <br /> B. Knowledge of Market: Describe your firm's familiarity with the local labor <br /> and subcontracting market, or state how you will obtain this and the capability <br /> and tools of your firm in working with subcontractors to generate viable and <br /> competitive prices <br /> C. Use of Local Contractors: <br /> 1. Outreach Efforts: Describe the Proposers.planned outreach efforts for <br /> ensuring that local contractors have sufficient information about <br /> subcontract bid packages on this Project. <br /> 2. Strategies and Approach: Discuss your firm's strategies and approach <br /> for arranging and packaging subcontract bid packages to encourage <br /> the participation of local contractors <br /> 9.0 REFERENCE CHECKS <br /> Prior to the interview with finalists, the City will conduct reference checks by contacting <br /> those individuals submitted by the Contractor with their proposal in response to this <br /> RFP. In addition, the City may contact references not listed by the Contractor. <br /> Reference checks will not be scored separately, but will be used to validate information <br /> included in the Proposals submitted by Contractors. <br /> 10.0 INTERVIEWS <br /> After evaluation of the Proposals in accordance with the points described in this RFP, <br /> the selection committee shall develop a list of the most qualified firms (shortlist) and <br /> City of Everett Page 29 April 16, 2012 <br /> Water Pollution Control Facility Expansion-Phase B 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.