My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/04/04 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/04/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 10:00:15 AM
Creation date
5/10/2017 9:58:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� REQUEST FOR PROPOSALS <br /> X/- General Contractor/Construction Manager Services for <br /> � Water Pollution Control Facility Expansion-Phase C <br /> _:mac <br /> Conditions for each phase of work, shall score the full 200 points possible for <br /> the Final Proposal criterion. <br /> Other Final Proposals will receive points for the Final Proposal criterion based <br /> on the following formula: <br /> Low Conforming Final Proposal Price divided by the Contractor's Final <br /> Proposal Price multiplied by 200 (total points available). <br /> C. Prices Requested: Proposers invited to submit Final Proposals will submit <br /> the price amounts on a Final Proposal Form to be provided, as described in <br /> Section 5.0 E. The definitions of the Percent Fee and Specified General <br /> Conditions Work will be specifically defined in the Request for Final Proposals <br /> (RFFP)to be provided to those firms selected to submit Final Proposals. <br /> D. Calculating the Total Proposal Amount: The dollar amounts submitted on the <br /> Final Proposal Form will be added together to determine a single number for <br /> the Total Proposal Amount. <br /> E. Time Period for Validity of Total Price Offer Amount: In submitting a Final <br /> Proposal, all Proposers agree that the prices included in the Final Proposal <br /> Form shall be valid until completion of all Preconstruction Services and <br /> through completion of negotiations for each Phase Cl MACC and Phase C2 <br /> MACC, and execution of the GC/CM Construction Contract(s) for Phase Cl <br /> and Phase C2, for the full Total Contract Cost. <br /> F. Irregularities: In completing the Final Proposal Form, the Proposer must <br /> enter a number for each item on the form. No other entries, modifications, <br /> qualifications, or exclusions shall be made to the Final Proposal Form. <br /> Failure to comply in full with these requirements may be grounds for a Final <br /> Proposal being declared non-responsive. The City reserves the right to reject <br /> any or all Final Proposals, and to waive as an informality any non-material <br /> irregularities in the Final Proposal received. <br /> G. Data for Final Proposal Form: The name, address, and Contractor's <br /> Washington State registration number shall be typed or printed on the Final <br /> Proposal Form in the space provided, along with the other information <br /> required on the Form. <br /> H. Filling out the Final Proposal Form: Final Proposals must be (1) submitted on <br /> the forms furnished by the City or on copies of those forms, and (2) manually <br /> signed in ink. The person signing the Final Proposal Form must initial each <br /> page. <br /> City of Everett Page 31 April 16, 2012 <br /> Water Pollution Control Facility Expansion-Phase Q4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.