Laserfiche WebLink
Subtask 2.2— CPARB Approval Process <br /> • SAIC will take the lead role in preparation of the project approval application and <br /> presentation for questions related to appropriateness of GC/CM method for the project and <br /> its public benefits. <br /> • SAIC staff will attend the CPARB meeting. <br /> City to Provide <br /> • Background information for application. <br /> Deliverables <br /> • CPARB PRC Application. <br /> ■ CPARB PRC Presentation. <br /> Subtask 2.3— Request for Proposal (RFP) Development <br /> • SAIC will compile existing example procurement documents. <br /> U. SAIC will compile a draft RFP. <br /> • SAIC staff and the City will discuss draft RFP and SAIC will receive one set of final City <br /> comments on the draft RFP. <br /> • SAIC will reissue RFP incorporating the City's comments on draft RFP. <br /> City to Provide <br /> • Project general background information. <br /> • One timely, single set of comments on the draft RFP: <br /> • Legal review to ensure consistency with RCW 39.10. <br /> • City to issue advertisements for RFP. <br /> Deliverables <br /> • Draft RFP. <br /> • Final RFP. <br /> Subtask 2.4—Request for Final Proposal (RFFP) Development <br /> ■ SAIC will take the lead in developing the RFFP bidding instructions and final bid than. <br /> ■ The City will provide legal review and comment on the RFFP language and content. <br /> Deliverables <br /> ■ Draft RFFP. <br /> ■ Final RFFP. <br /> File: 001581 l 9651100046 March 28,2012 Page 6 of 19 <br /> 9 <br />