My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/06/13 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/06/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 9:33:18 AM
Creation date
5/12/2017 9:32:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subtask 2.5—Preconstruction Contract <br /> ■ SAIC will take the lead in developing a draft Preconstruction Contract. <br /> ■ SAIC will respond to contractual questions during the procurement process. <br /> ■ SAIC will compile existing Preconstruction Contracts from other GC/CM projects in <br /> Washington State,to be used as references. <br /> • SAIC will collaborate with City staff, the Design Engineer (as appropriate), and City <br /> attorney, to prepare the draft Preconstruction Contract. <br /> • The Form of the Preconstruction Contract will be an attachment to the RFFP. <br /> City to Provide <br /> • The City will provide legal review and comment on the Preconstruction Contract language <br /> and content. <br /> Deliverables <br /> • Preliminary draft Preconstruction Contract. <br /> • Final Form of Preconstruction Contract. <br /> Subtask 2.6—Construction Contract <br /> • SAIC will compile existing Construction Contracts obtained from others to be used as <br /> references. <br /> • SAIC will respond to contractual questions during the procurement process. <br /> • SAIC will prepare a preliminary draft Construction Contract for review by the City. <br /> • SAIC will collaborate with City staff, the Design Engineer (as appropriate), and City <br /> attorney,to prepare the draft Construction Contract. <br /> • The Foiu1 of the Construction Contract will be an RFFP attachment. <br /> City to Provide <br /> ■ The City will provide legal review and comment on the Construction Contract language <br /> and content. <br /> Deliverables <br /> ■ Preliminary draft Construction Contract. • <br /> • Final Form of Construction Contract. <br /> Subtask 2.7—General Conditions <br /> • SAIC will take the lead in developing the General Conditions. <br /> • SAIC will respond to contractual questions during the procurement process. <br /> File: 001581 I 9651100046 March 28,2012 Page 7 of 19 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.