Laserfiche WebLink
• SAIC will review the City's standard General Conditions, and incorporate as appropriate <br /> • to support the requirements of GC/CM contracting and the WPCF GC/CM project. <br /> • SAIC will collaborate with City staff, the Design.Engineer (as appropriate), and City <br /> attorney,to prepare the draft General Conditions. <br /> • The General Conditions will be an RFFP attachment. <br /> City to Provide <br /> • The City will provide input on General Conditions language and content. <br /> • The City Attorney.will provide legal review and comment on the General Conditions. <br /> Deliverables • <br /> • Draft General Conditions. <br /> • Final General Conditions. <br /> Subtask 2.8—Division 1 Specifications <br /> • SAIC will take the lead in developing the Division 1 specifications. <br /> • SAIC will review the City's Division 1 Specifications, and modify as appropriate to suit <br /> the requirements of GC/CM contracting and the WPCF GC/CM project. <br /> • SAIC will respond to specification questions during the procurement process. <br /> • SAIC will collaborate with City staff, the Design Engineer (as appropriate), and City <br /> attorney,to prepare the draft Division 1 Specifications. <br /> • • The Division 1 specifications will be an RFFP attachment. <br /> City to Provide <br /> • The City will provide input on Division 1 specifications language and content. <br /> • The City Attorney will review the Division 1 specifications. <br /> • <br /> Deliverables <br /> • Draft Division 1 specifications. <br /> • Final Division 1 specifications. <br /> • <br /> Subtask 2.9—Cost Allocation Matrix <br /> The Cost Allocation Matrix clearly identifies all components of the Total Contract Cost(percent <br /> fee, specified general conditions, negotiated support services, etc.), including applicable section <br /> references to the project procurement documents (Preconstruction Contract, Construction <br /> Contract, General Conditions, Division 1 specifications, and technical specifications). <br /> • SAIC will take the lead in developing the Cost Allocation Matrix. <br /> File: 001581 19651100046 March 28,2012 Page 8 of 19 <br /> 11 <br />