Laserfiche WebLink
• <br /> • <br /> . 1 <br /> • <br /> • <br /> City to Provide <br /> • GC/CM's cost estimate as submitted to City. <br /> • <br /> Deliverables <br /> • Review comments on baseline cost estimate. <br /> Subtask 3.18—Review Construction Cost Estimate Update <br /> • As requested, SAIC will review the 90 percent construction cost estimate update prepared <br /> by the GC/CM contractor with respect to discrepancies in cost categories, material costs, <br /> • production rates, completeness, etc. <br /> City to Provide <br /> ■ GC/CM's 90.percent construction cost estimate. <br /> Subtask 3.19—Provide Support on Early Subcontract Bidding <br /> ■ If applicable and requested, SAIC will provide assistance on early subcontract bid <br /> packaging (including prequalification and responsibility). This subtask only applies if the <br /> GC/CM contractor elects to procure mechanical or electrical subcontractors during the <br /> preconstruction period. Two scenarios may occur depending on whether GC/CM intends <br /> . to self-perform subcontract work. <br /> • If GC/CM intends not to self-perform work for an early bid package, it is assumed that <br /> SAIC will: • <br /> — Review the subcontract bid packagesprepared by the GC/CM,including but not limited <br /> to bidder responsibility. • <br /> • <br /> • If the GC/CM intends to self-perform work for an early bid package, it is assumed that <br /> SAIC will: <br /> — Assist with the.hearing process (advertising, participation in public hearing, make <br /> changes to criteria based on hearing) <br /> — Develop RFQ <br /> — Evaluate qualifications of proposers <br /> — Review the bid documents of the most highly qualified bidders and assist with <br /> evaluation of bids <br /> City to Provide • <br /> • Information on City procurement processes. <br /> Deliverables <br /> • Assistance with and documentation of subcontractor procurement. • <br /> • <br /> File: 001581 I 9651100046 March 28,2012 Page 16 of 19 <br /> 19 <br />