My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6101 ASSOCIATED BLVD BASE FILE 2017-06-05
>
Address Records
>
ASSOCIATED BLVD
>
6101
>
BASE FILE
>
6101 ASSOCIATED BLVD BASE FILE 2017-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 1:50:29 PM
Creation date
5/15/2017 10:33:04 AM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6101
Tenant Name
BASE FILE
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Earth Solutions NW«C Field Rep. Project No. Page of Report No. <br /> Wendy ES-2232.3 1/1 2 <br /> t 1805 136t'Place NE, FAX: Time On Site Time Off Site Date Day of Week <br /> Suite 201 (425)449-4711 <br /> Bellevue,WA 98005 TOLL FREE: 9;30/1:00 10:30/2:00 4/15/14 Wed. <br /> (425)449-4704 (866)366-8710 <br /> DAILY FIELD REPORT Travel Time Weather <br /> 1.5 Hr Mostly Sunny <br /> Project Name Job Location Client/Owner <br /> Mountain View Business Center Associated Blvd &Industrial Street, Underwood Gartland Everett, LLC <br /> —Lot 1 Everett <br /> General Contractor General Contractor's Superintendent Received Onsite By <br /> Foushee Mark/Jason <br /> Grading Contractor Grading Foreman Checked By <br /> Archer Steve <br /> Are approved Plans/Permits onsite ❑ YES ❑ NO Project No. Permit No. <br /> Supplementary Report: <br /> As requested by client, ESNW was onsite to observe the earthwork activities. The following was observed: <br /> Upon arrival of the first visit, contractor was currently excavating for sewer line within the building limits. The <br /> contractor recently encountered a pocket of trapped water that began filling the excavation and interfering with the <br /> installation of pipe. Contractor was currently pumping the water from the excavation. At time of second visit, the <br /> contractor had passed the section of trapped water and the conditions improved. The contractor installed 219' of <br /> sewer line today at a 2% slope grade. They bedded the pipe in sand then used the recycled concrete material as fill <br /> above the bedding. Contractor placed approximately 2' of recycled concrete material and bucket tapped the material <br /> in at this time. The contractor plans to hoe pack the material in the morning to ensure the drying of the pipe glue prior <br /> to using the hoe pack on the material. <br /> ESNW will return as needed <br /> Wendy Jones <br /> COPY TO: CONTINUED ON NEXT PAGE ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.