My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/07/25 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/07/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2017 10:54:10 AM
Creation date
5/15/2017 10:51:22 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/25/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
580
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�J <br /> cn <br /> Table 1. Cost Estimate for Everett Smith Island 2012 amendment to mitigation site monitoring <br /> last modified July 5,2012,tl Consulting Staff Production Staff <br /> Employee Name Matthies M Luiting V Fisher M Stratten D <br /> Sr Tech Assoc Admin <br /> Task ICF Jones&Stokes Labor Classification Prot Dir Sr Consult II Analyst Consult III Editor Tech Subtotal Labor Total Total Price <br /> Task 1. Water Surface Elevation Monitoring and Analysis $0 $0 $5,075 <br /> 1.1 post process collected data July, August,Nov 2012 and Feb 2013 6 8 • <br /> $0 $1,840 <br /> N 1.2 November 2012 and Feb 2013 analysis of cumulative data and 2 summary memos 1 4 13 4 $0 $3,235 <br /> CTI <br /> c) Task 2.Modifications to Mitigation Performance Standards $0 $0 $5,450 <br /> 2.1 client meetings/discussions regarding modified standards 1 4 $0 $715 <br /> 2.2 draft modified standards proposal for client;client edits • 1 8 • 2 $0 $1,555 <br /> 2.3 meeting with Corps,Ecology,and EPWD and follow up summary of results 4 $0 $520 <br /> 2.4 Memo to modify Smith Island/Union Slough Mitigation Monitoring Plan 1 12 2 3 3 $255 $2,660 <br /> Task 3. Project Management and Coordination,July 2012 to Feb 2013(8 months) $0 $0 $2,495 <br /> 3.1 budget tracking,invoicing,internal coordination 1 8 <br /> 4 $220 $1,455 <br /> 3.2 client coordination and updates,internal coordination 8 $0 $1,040 <br /> • <br /> Task 4. Additional Documentation Services • <br /> $0 $0 $6,935 <br /> prepare one detailed analysis and water surface elevation drop report or a mitigation credit use plan 1 16 ? 16 i 16 4 $340 $6,935 <br /> Total hours 6 64 39 31 7 4 <br /> ICF Jones&Stokes billing rates $195 $130 $160 $110 $85 $55 <br /> Subtotals $1,170 $8,320 $6,240 $3,410 $595 $220 $815 $19,955 <br /> Total price $19,955 <br /> Date printed 7110/201.2 10:42 AM Approved by Finance 1 sh 1 SmithIs1_20 t2Monitor_amend_070512(client).xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.